Laserfiche WebLink
LIME STATION FIELD PROCESS AREA LIME STATION SCADA CONTROL PANEL SDP SCADA CONTROL PANEL SDP SCADA COMPUTER <br />TE In 1 --------- SELECT, FlC <br />('Y 2 <br />283 283 SEE LOOP 201 S OKRU(N) 200 <br />...........................: <br />---- n._ , SP SP <br />5289 <br />CONTROLLER <br />- - COM3 <br />? RS-232 <br />_..:..:' ! RJ45 <br />--- P7 <br />RJ45 <br />N <br />N <br />I <br />L/`9d[\] M <br />K <br />FCV C8 <br />206 5382 E2 <br />ANALOG OUTPUTS <br />P3 DATA <br />CONVERTER <br />M - - Inl + 1 A03-1 RJ45 2 <br />- - - - - - - - - <br />- - - - - - - - - - - - - - <br />.. ? I - -- lil- <br />RJ45 <br />a? . i, >' <br />128 VAC Q <br />(LP-35) 2 <br />C4 <br />.... ............. ........... <br />1 1 ? <br />.. w <br />x <br />2 -- ---- 2 -- <br />- - - - <br />- <br />3 Ib - - - - ?yl 3 I+ I I --..... _.. ETHERNET/FIBER ETHERNET/FIBER <br />FIT <br />MAGMETER 288 E200 I - - - SWITCH SWITCH <br />RJ45 RJ45 <br />FIBER OPTIC <br />TX SC SC RX <br />NOTE: INSTALL DATA AND POWER I FIBER OPTIC <br />CONDUCTORS IN SEPERATE CONDUITS RX SC SC TX <br />LIL2- <br />20 VAC <br />P-37) Q2 <br />i <br />2 AS BUILTS O.C. 12 10 07 <br />1 DELETED TCV-203 O.C. 104/13/-07 <br />FLOW: FRESH WATER TO SLAKER #3 (SHEET 3 OF 3) NOTES: 0 ISSUED FOR CONSTRUCTION M,$ IL <br />08 31 O6 <br />NO REVISIONS BY DATE <br />SET POINT : 38 GPM/STPH (10% SLURRY BY WEIGHT) FOR EACH SLAKER RUNNING 1. THE LIME FEED RATE WILL BE ESTIMATED FROM THE SLAKER SPEED. THE TARGET FLOW RATE <br />FOR FE-200 WILL BE CALCULATED BASED ON 38 GPM/STPH. © CLIMAX MOLYBDENUM <br />ALARM HIGH HIGH : NONE ASubsidiary of Phelps Dodge Corporation <br />2. IF TWO SLAKERS ARE REQUIRED TO RUN SIMULTANEOUSLY, THEY MUST RUN AT THE SAME SPEED. SLUDGE MANAGEMENT PROJECT <br />ALARM HIGH :NONE <br />3. EXISTING EQUIPMENT IS SHOWN IN GREY. NEW EQUIPMENT IS SHOWN IN BLACK 05018-1-50b CONTROL LOOP 200 SHT 2 of 3 McNULTY LIME STATION <br />ALARM LOW : NONE CONTROL LOOP 200 <br />05018-I-SOc CONTROL LOOP 200 SHT 1 of 3 (SHEET 3 OF 3) <br />ALARM LOW LOW : NONE 05018-D-02 PIPING & INSTRUMENTATION DIAGRAM /{/?/???/ <br />DRAWING N0. DRAWING TITLE 07471./ fNCORPOfogTED <br />INTERLOCK : NONE REFERENCE DRAWINGS CAD-OF G.McCosh OS 22 06 <br />THIS DRAWING WAS PREPARED BY LYNTEK, ALL OF THE CND. K. LEWIS OS 22 O6 20507.0707 <br />CONTROLS : FCV-204 MODULATES TO MAINTAIN THE SELECTED FLOW RATE INFORMATION CONTAINED THEREIN IS THE PROPERTY OF P•N• J. HARVEY DRAWING NO. REV. <br />LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT CLIENT <br />THE PROPER WRITTEN AUTHORIZATION OF LYNTEK. SCALE: (D) NONE 0501 S-I-50C 2