Laserfiche WebLink
LIME STATION FIELD PROCESS AREA LIME STATION SCADA CONTROL PANEL SDP SCADA CONTROL PANEL SDP SCADA COMPUTER <br />TE TIT 1 ------ <br />201 201 SEE LOOP 201 <br />2 - - - - - - - - - <br /> <br /> <br />FCV C7 <br />5302 <br />204 ANALOG OUTPUTS <br />P3 <br />- - - - - - - - - - - - - + <br />M I I 3 A02-3 <br />- - - - - - - - - - - - - - - - <br />--? - <br />I 1 <br />12e vac <br />._................ -- .._... .................... ........... ---- A 1 <br />2 - --- <br />? II II <br />MAGMETER 200 3 - <br />7 -- - - <br />8 -- - - <br />NOTE INSTALL DATA AND POWER <br />CONDUCTORS IN SEPERATE CONDUITS <br />FLOW: FRESH WATER TO SLAKER #1 (SHEET 1 OF 3) <br />SET POINT : 38 GPM/STPH (10% SLURRY BY WEIGHT) FOR EACH SLAKER RUNNING <br />ALARM HIGH HIGH : NONE <br />ALARM HIGH : NONE <br />ALARM LOW : NONE <br />ALARM LOW LOW : NONE <br />INTERLOCK : NONE <br />CONTROLS : FCV-204 MODULATES TO MAINTAIN THE SELECTED FLOW RATE <br />120 VAC <br />(LP-37) <br />A <br /> C4 <br /> <br /> <br /> <br /> 1 <br />SP <br />M <br />N <br />I <br />C <br />E2 <br />DATA <br />CONVERTER <br />SP <br />5209 <br />CONTROLLER <br />COM3 <br />RJ45 - <br />P7 <br />t7i <br />z <br />Uj <br />RS-232 <br />RJ45 <br /> z <br /> <br />E1 E1 <br />ETHERNET/FIBER ETHERNET/FIBER <br />SWITCH SWITCH <br /> RJ45 RJ45 <br /> FIBER OPTIC <br />TX 5C SC RX <br /> FIBER OPTIC <br />RX SC SC TX <br />NOTES: <br />1. THE LIME FEED RATE WILL BE ESTIMATED FROM THE SLAKER SPEED. THE TARGET FLOW RATE <br />FOR FE-200 WILL BE CALCULATED BASED ON 38 GPM/STPH. <br />2. IF TWO SLAKERS ARE REQUIRED TO RUN SIMULTANEOUSLY, THEY MUST RUN AT THE SAME SPEED. <br />3. EXISTING EQUIPMENT IS SHOWN IN GREY. NEW EQUIPMENT IS SHOWN IN BLACK <br />THIS DRAWING WAS PREPARED BY LYNTEK, ALL OF THE <br />INFORMATION CONTAINED THEREIN IS THE PROPERTY OF <br />LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT <br />THE PROPER WRITTEN AUTHORIZATION OF LYNTEK. <br />SELECT <br />SLAKER(S) <br />TO RUN <br />u <br />0 <br />MOLYBDENUM <br />© C6LIM" Dodge Phelps a <br />SLUDGE MANAGEMENT PROJECT <br />MCNULTY LIME STATION <br />CONTROL LOOP 200 (SHEET 10F 3) <br />ISIK INCORPORATED <br />K.MLEWIS os zi us 12'j 1544 <br />'.M. J. HARVEY DRAWING N0. REV. <br />:LIEN 05018-1-5Oa 2 <br />;GALE: (D) NONE