My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:24:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 2)
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Looa4Bona 3 BAN PUMP STAY 00 N <br />DESCRIPTION NO. UNITS <br />O 24 VDC DC POWER SUPPLY, SOU, SDN-10-24-IOOP 1 EACH <br />O DIN RAIL - 6', PHOENIX 5 SECTION <br />Q SCADAPack2 w/5606 1/0, CM P305-1AOO-AD20 1 UCH <br />® 5103 UPS POWER SUPPLY MODULE, CM 297102 1 EACH <br />Q ETHERNET SURGE SUPPRESSOR, SIXNET, SP-ETH-2 1 EACH <br />© 5-PORT ETHERNET SWITCH, LANOUNX X-50153 1 EACH <br />O 120VAC CIRCUIT BREAKER - UARE D 60112 ® 2 EACH <br />® 24VDC CIRCUIT BREAKER - SQUARE D 6011 1 EACH <br />Og 1 LEVEL TERMINAL BLOCKS, PHOENIX UK 5 N 83 EACH <br />10 1 LEVEL TERMINAL BLOCKS W/GND, PHOENIX, USLKG 5 27 EACH <br />11 3 LEVEL T. BLOCKS W/GND, PHOENIX, PIK 4-PE/L/NIB 13 EACH <br />12 4 LEVEL T. BLOCKS W/CND, PHOENIX, OLK 4-PE 30 EACH <br />13 RECEPTACLE, PHOENIX CONTACT 5600462 1 EACH <br />14 WIRE DU Y W x 7.0'H ® 8 SECTION <br />15 WIRE DUCT CO 2' 8 SECTION <br />16 FIBER/ETHERNET CONVERTER, AAXEON IMC-10OS3 1 EACH <br />17 5505 RTD MODULE, CM 297151 6 EACH <br />18 FLOURESCENT UGH? HOFFMAN ALTDBI 2 EACH <br />19 fNCLDSURE HOffW <br />A544208LP (54'a42*X8j <br />1 <br />EACH <br />20 PANEL, HOFFMMI 4P42 (50'a381 ® 1 EACH <br />21 NOT USED I EACH <br />22 RISE I% UK 5-HEST 41 EACH <br />NOTES: <br />1. ELECTRICALLY BOND THE ENCLOSURE, DOORS, PANEL, <br />AND ALL DIN RAIL TOGETHER. GROUNDING TERMINAL BLOCKS <br />CLAMP TO THE DIN RAIL FOR GROUNDING <br />2. INCLUDE ALL MARKINGS REQUIRED BY UL508A. <br />3. CONTRACTOR IS RESPONSIBLE FOR UL508A COMPLIANCE <br />AND USTING. CONTRACTOR SHOULD VERIFY ALL PRODUCTS <br />SPECIFIED WILL MEET THE REQUIREMENTS OF UL508A. <br />4. CONTRACTOR SHALL SUPPLY ALL COMPONENTS <br />REQUIRED FOR A COMPLETE, FUNCTIONAL <br />CONTROL SYSTEM <br /> <br />© CLIMAX MOLYBDENUM <br />A Subsidiary of Phelps Dodge Corporation <br />SLUDGE MANAGEMENT PROJECT <br />3 DAM PUMP STATION <br />SCADA CONTROL PANEL LAYOUT <br />111A INCORPORATED <br />nor cnu.?? unnnn•w vw-v r. amnwnrv w u uo <br />THIS DRAWING WAS PREPARED BY LYNTEK, ALL OF THE CKD. K. LEWIS 04/10/06 1 20407.1105 <br />INFORMATION CONTAINED THEREIN IS THE PROPERTY OF P. - J. HARVEY DRAWING N0. REV <br />LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT CUENT 05018-I-31 3 <br />THE PROPER WRITTEN AUTHORIZATION OF LYNTEK. SCALE (D) N.T.S.
The URL can be used to link to this page
Your browser does not support the video tag.