Laserfiche WebLink
<br />GROUND <br />SURFACE <br />8"XCEL / COMPACTTO <br />GAS LINE J 95% PROCTOR <br />TYPICAL TRENCH <br />DETAIL <br />REF. DWG C-04 <br />GAS LINE CROSSING DETAIL <br />1 <br />PUN NEW <br />0 3 6 9 <br />Scale in Feet <br /> 30"HDPE <br />ROADWAY DISCHARGE LINE <br />SURFACING <br /> 30" X 6" <br /> REDUCING TEE <br />-RO WAY <br /> FLOW <br /> <br /> <br />N 3'-0" (APPROXIMATE) <br />30" HDPE FLANGE ADAPTER <br /> AND BACKING RING <br /> <br /> (TYP 4) <br /> 66 <br />"VENT <br /> ASSEMBLY <br /> V-6 <br />MIN. <br /> <br />BOLLARD (TYP 2) <br /> SEPARATION FIELD LOCATE <br /> ^ <br />31Y' HOPE <br />PIPE <br />NOTES: 1) NOTIFY XCEL FOR GAS LINE LOCATE <br />BEFORE APPROACHING CROSSING LOCATIONS. <br />2) GAS LINE MUST BE SUPPORTED OVER OPEN EXCAVATION. <br />3) REPAIR ANY DAMAGE TO. GAS LINE COATING <br />PER XCEL SPECIFICATIONS. <br />30" HOPE FLANGE ADAPTER BOLLARD <br />AND BACKING RING 4) 12" CLEANOUT <br />(TYP <br />30" X 12" <br />REDUCING TEE <br />TYP <br />Td? 60- ELBOW 265 <br />Q 9 <br />0 °o# <br />ADJUST AS REQ'D <br />I <br />12"BURIED SERVICE VALVE 307 <br />12" HDPE 12" FLANGE ADAPTER <br />DRAIN LINE AND BACKING RING <br />FIELD ROUTE (TYP 5) <br />TO DAYLIGHT <br />11 <br />C 06 4N <br />30" HDPE VENT/DRAIN / <br />PUN VIEW <br />o a e z <br />Sole in Fed <br />221 6" 316 SS <br />180" RETURN BEND 6" 316 SS STD. Wr. PIPE <br />((FIELD FIT) 116 <br />BOLLARD <br />(TYP 2) 6" 316 SS THREADED <br />150 LB. FLANGE 274 <br />GROUND <br />SURFACE <br />6'-0" BERM AND SWALE TO DIRECT <br />VENT DISCHARGE AWAY <br />FROM INTERCEPTOR CANAL. <br />238 6" FLANGE ADAPTER <br />454 AND BACKING RING <br />30" HDPE <br />PIPE <br />I L <br />STA 65+60 <br />30"X6" REDUCING TEE (FIELD VERIFY) <br />261 <br />BEND 30" HDPE FIELD LOCATE <br />PIPE TO MATCH <br />GROUND CONTOUR <br />5" SOIL PIPE <br />VALVE EXTENSION <br />POSITION INDICATOR <br />BOLLARD <br />(TYP 4) 12" PVC BLIND <br />FLANGE <br />IJ-L- 12" FLANGE ADAPTER <br />AND BACKING RING <br />FLOW <br />60" HOPE ELBOW <br />12"90* <br />HOPE ELBOW <br />12" HDPE <br /> 30" HDPE VENT DRAIN A <br />SEMON G06 <br />a a e z <br />Scale in Feel <br /> auane ND. REFERPLE <br />Tres Sawing te9etha' wM xa pardd eNrsmres made file N0. <br />mw <br />ew,ox er <br />gm.BY <br />R@MVea <br />Fit. RemA <br />Record <br />BY <br />Oat . <br />W. W. Whaala and RuodatM lac <br /> is Me lwsOeNYOI W.Wefiestr6Associates. uvms ? anae salt oa P.aas.aarGwn2.1eweve awellaeuea Design Climax Sludge Management Project Water <br />Resources elBineers <br />w 2- D- ? CGmax Mine ?el? O le <br />Z oNensese exupN4 a superae0e0EY ariMen a9re«nxt RECORD Z © smms ocet sea wmaFO,fonseeren LIENT <br /> <br />w <br />with RedientstteOAtMLYasbck. NisAmishednnthe <br />DRAWING <br />0 <br />0 <br />samr <br />ocx <br />sla <br />aeconsM To <br />em.ve <br />Check <br /> <br />i C <br />: Climax Mol , CO <br />?denum Co. -Climax <br />w ..peaemndaonharsnaehot be nFOde<ampaa j #3 Dam Seepwater Pump System e Drawin No. <br />9 <br /> rmrused raenr eUxpxpose than for wkW at DATE 11/1/07 <br />a: Q ?esmw.,ne Pipeline 1051.23.0 1 -- <br />- <br />Cr speofiasybleshedwMmdUeynarwrdtenmmreof roasaws see D3PS-C-O6 <br /> saaWWPReeler&A---ts ? Sections and Details AS NOTED <br />