My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-28_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2008-02-28_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:04 PM
Creation date
5/30/2008 8:16:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
2/28/2008
Doc Name
Certification 3-dam pump station & pipeline, sludge densification plant & pipeline (part 1)
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR7
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05018•X-01 DRAWING INDEX AND GENERAL LEGEND <br />PROCESS FLOW DIAGRAMS (PFD <br />05018-F-01 SITE SOURCE AND TREATED WATER <br />05018-F-02 UME STATION <br />05018-F-03 SLUDGE DENSIFICATION PLANT <br />05018-F-04 SLUDGE DENSIFICATION PLANT <br />05018-F-05 SLUDGE DENSIFICATION PLANT <br />05018-F-06 3 DAM PUMP STATION AREA AND BELOW <br />PIPING & INSTRUMENT DIAGRAMS (P&ID's <br />05018-D-01 STANDARD P&ID SYMBOLS <br />05018-D-02 LIME STATION <br />05018-D-03 SDP NEUTRALIZATION & WARREN'S PUMP STATION <br />05018-D-04 SOP LIME & FRESH WATER SYSTEMS <br />05018-D-05 SDP CLARIFIER AREA <br />05018-D-06 SDP BLOWERS, POLYMER, AND PLANT AIR SYSTEMS <br />05018-0-07 3 DAM PUMP STATION, 5 DAM & MAYFLOWER POND UTILITIES <br />CIVIL <br />05018-C-01 OVERALL SITE PLAN <br />05018-C-02 LIME STATION SITE PLAN <br />05018-C-03 7A RISER PROBE SHED <br />05018-C-04 SLUDGE DENSIFICATION PLANT SITE PLAN <br />® 05018-C-05 ETDL PIPELINE CUT-OFF AT SDP COLLECTION CHAMBER <br />_q* BEFAIL- 9 6 - VOID <br />05018-C-10 PIPEUNE RETANNG WALL DETAILS <br />05018-C-11 6' LIME. 4' WATER FROM LIME TO SDP 4' LIME TO EAST CHANNEL PROFILES <br />05018-C-12 LIME SLURRY CIVIL UME FROM SDP TO 3 DAM TIE-IN <br />® 05018-0-13 SLUDGE CELL DISTRIBUTION PLAN <br />05018-C-14 SLUDGE CELL DISTRIBUTION DETAILS <br />05018-C-17 PIPELINE TRENCH, VENT AND CLEANOUT DETAILS <br />GENERALARRANGEMENTS <br />05018-G-01 LIME STATION MODIFICATION PLAN <br />05018-G-02 UME STATION MODIFICATION ELEVATION <br />05018-G-03 UME STATION MODIFICATION ELEVATION <br />05018-G-05 SLUDGE DENSIFICATION PLANT - GENERAL ARRANGEMENT PLAN <br />05018-G-06 SLUDGE DENSIFICATION PLANT - GENERAL ARRANGEMENT EAST ELEVATION <br />05018-G-07 SLUDGE DENSIFCATION PLANT - BUILDING G.A. - LOWER PLAN <br />05018-G-08 SLUDGE DENSIFICATION PLANT - BUILDING G.A. - UPPER PLAN <br />05018-G-09 SLUDGE DENSIFICATKXN PLANT - GENERAL ARRANGEMENT SECTIONS <br />05018-G-10 SLUDGE OENSIFICATION PLANT - BUILDING G.A. - EAST ELEVATION <br />05018-G-11 SLUDGE DENSIFICATION PLANT - BUILDING GA - EAST ELEVATION <br />05018-G-12 SLUDGE DENSIFICATION PLANT - CLARIFIER PUMP VAULT <br />STRUCTURAL STEEL AND CONCRETE <br />05018-S-01 STANDARD CONCRETE NOTES AND DETAILS <br />05018-S-02 STANDARD MASONRY NOTES AND DETAILS <br />05018-S-03 STANDARD STEEL NOTES AND DETAILS <br />05018-S-04 STANDARD STAIR AND HANDRAIL DETAILS <br />05018-S-05 LIME PLANT PLAN <br />05018-S-07 COLLECTION CHAMBER PLANS AND ELEVATIONS <br />05018-S-08 COLLECTION CHAMBER REINFORCING SHT 1 OF 2 <br />® 05018-S-09 COLLECTION CHAMBER REINFORCING SHT 2 OF 2 <br />- VOID <br />05018-S-11 SDP - BUILDING FOUNDATION PLAN <br />05018-S-12 SOP - GROUND FLOOR PLAN <br />05018-S-13 SDP - PLATFORM & PIPERACK FRAMING PLAN <br />05018-S-14 SOP - OVERHEAD CRANE PLAN <br />05018-S-15 SDP - BUILDING ROOF FRAMING PLAN <br />05018-S-16 SOP - BUILDING CONCRETE SECTIONS AND DETAILS <br />05018-S-17 SDP - BUILDING CONCRETE SECTIONS AND DETALS <br />05018-S-18 SDP - FOUNDATION SECTIONS AND DETAILS <br />05018-S-19 SDP - BUILDING STEEL FRAMING ELEVATIONS <br />05018-S-20 SDP - PLATFORM & PIPERACK FRAMING SEC71ONS <br />05018-S-21 SDP - PLATFORM & PIPERACK DETAILS <br />05018-S-22 SDP - PLATFORM & PIPERACK DETAILS <br />05018-S-23 SOP - BRIDGE CRANE DETAILS. <br />05018-S-24 SDP - PARTIAL PLANS AND DETAILS <br />05018-S-25 SDP - MISC. DETAILS SHT 1 OF 2 <br />05018-S-26 SDP - MISC. DETAILS SHT 2 OF 2 <br />05018-S-27 SDP - CLARIFIER CONCRETE PLAN <br />05018-S-28 SDP - CLARIFIER CONCRETE SECTIONS AND DETAILS SNT, <br />® 05018-S-29 SOP - CLARIFIER CONCRETE SECTIONS AND DETAILS SHT. <br />05018-S-30 SDP - BUILDING STEEL FRAMING DETAILS <br />05018-S-32 SOP - BRIDGE TO CLARIFIER SHT 1 OF 2 <br />05018-S-33 SOP - BRIDGE TO CLARIFIER SHT 2 OF 2 0 <br />ARCHITECTURAL <br />05018-A-01 SOP - GROUND FLOOR PLAN <br />05018-A-02 SOP - PLATFORM LEVEL FLOOR PLAN <br />05018-A-03 SDP - ROOF PLAN <br />05018-A-04 SDP - PARTIAL FLOOR PANS <br />05018-A-05 SDP - PARTIAL FLOOR PUNS <br />05018-A-06 SDP - EXTERIOR ELEVATIONS <br />05018-A-07 SDP - BUILDING & WALL SECTIONS SHT 1 OF 2 <br />05018-A-08 SDP - BUILDING & WALL SECTIONS SHT 2 OF 2 <br />05018-A-09 SDP - FINISH PLANS & SCHEDULE <br />05018-A-10 SDP - DOORS AND WINDOWS <br />05018-A-11 WOOD SHED FLOOR PLANS AND DETAILS <br />INDEX OF DRAWINGS <br />MECHANICAL <br />05018-M-01 NEUTRALIZATION TANK NO. 1 <br />05018-M-02 NEUTRAUZATION TANK NO. 2 <br />05018-M-03 LIME SLURRY TANK (SDP) <br />05018-M-04 ALKALIZATION TANK <br />05018-M-05 FRESH WATER TANK <br />05018-M-06 TANK DETAILS <br />® 05018-M-07 LAUNDER DETAILS SHEET 1 OF 2 <br />® 05018-M-08 FRESH WATER STORAGE TANK <br />05018-M-09 LAUNDER DETAILS SHEET 2 OF 2 <br />PIPING <br />05018-P-05 SLUDGE DENSIFICATION PLANT - COLLECTION BOX PIPING PLAN <br />0501 8-P-06 SLUDGE DENSIFICATION PLANT - LOWER PIPING PLAN <br />05018-P-07 SLUDGE DENSIFICATION PLANT - UPPER PIPING PLAN <br />05018-P-08 SLUDGE OENSIFICATION PLANT - SLUDGE PUMP VAULT <br />05018-P-09 SLUDGE DENSIFICATION PLANT - COLLECTION BOX PIPING SECTION A <br />05018-P-10 SLUDGE DENSIFICATION PLANT - PIPING SECTION A <br />05018-P-11 SLUDGE DENSIFICATION PLANT - PIPING SECTION B <br />05018-P-12 SLUDGE DENSIFICATION PLANT - PIPING SECTIONS <br />05018-P-13 SLUDGE OENSIFICATION PLANT - PIPING SECTIONS AND DETAILS <br />05018-P-14 PIPE SUPPORT DETAILS <br />05018-P-15 SLUDGE DENSIFICATION PLANT - TIE-IN TO EXISTING TEE <br />05018-P-16 SLUDGE DENSIFICATION PLANT - SLUDGE PUMP VAULT <br />05018-P-17 PIPE SUPPORT DETAILS <br />® 05018-P-18 POLYMER DILUTION PIPE DETAILS <br />05018-P-25 WASTE AND VENT PIPING PLAN AND DETAILS - SDP BUILDING <br />05018-P-26 WASTE AND VENT ISOMETRIC SDP BUILDING <br />05018-P-27 PLUMBING PARTIAL DOMESTIC WATER PIPING PUN AND DETAILS <br />05018-P-28 ROOF DRAINAGE PUN AND GENERAL NOTES SDP BUILDING <br />05018-P-29 SDP BUILDING ROOF DRAINAGE DETAILS AND ELEVATIONS <br />HVAC <br />05018-H-01 MECHANICAL HVAC DESIGN SOP FLOOR PLAN <br />05018-H-02 MECHANICAL BUILD OUT DESIGN SDP FLOOR PLAN <br />05018-H-03 MECHANICAL HVAC SDP ELEVATIONS <br />05018-H-04 MECHANICAL. HVAC DETAILS AND SCHEDULES <br />05018-H-05 MECHANICAL DESIGN PLAN - COMPRESSOR EQUIPMENT ROOM <br />05018-H-06 MECHANICAL ENLARGED GENERATOR PLAN <br />05018-H-07 SDP HVAC DUCT SUPPORT DETAILS AND ENLARGED MCC ROOM PLAN <br />05018-H-08 CLARIFIER ACCESS TUNNEL PLAN <br />ELECTRICAL <br />05018-E-01 STANDARD ELECTRICAL NOTES AND SYMBOLS <br />05018-E-02 ELECTRICAL SDP POWER AND GROUNDING PLAN <br />05018-E-03 SDP ELECTRICAL ONE-UNE DIAGRAM <br />05018-E-05 ELECTRICAL ENLARGED SDP POWER PLAN <br />05018-E-06 ELECTRICAL PANEL SCHEDULES ELP-222, LP-201 AND PP-201 <br />05018-E-07 ELECTRICAL SDP LOWER LEVEL LIGHTING PLAN <br />- <br />05018-E-08 ELECTRICAL SOP UPPER LEVEL LIGHTING PLAN <br />05018-E-09 ELECTRICAL ENLARGED SDP LIGHTING PLAN <br />05018-E-10 ELECTRICAL SDP TUNNEL AND BRIDGE LIGHTING PLAN <br />05018-E-11 SDP ELECTRICAL OUTSIDE LIGHTING PLAN <br />05018-E-12 ELECTRICAL FIXTURE DETAIL FOR SDP LOWER LEVEL <br />05018-E-13 SDP COLLECTION BOX AND COVERED WALKWAY LIGHTING PLAN <br />05018-E-14 ELECTRICAL FIXTURE DETAILS - UPPER LEVEL - PETROLUX II PTB W2 <br />05018-E-15 ELECTRICAL POWER AND GROUNDING DETAILS <br />05018-E-16 SDP ELECTRICAL LOWER PLAN <br />05018-E-17 SDP ELECTRICAL UPPER CONDUIT PLAN <br />05018-E-18 ELECTRICAL SDP MCC ELEVATION <br />05018-E-19 LIME STATION ELECTRICAL PLAN <br />05018-E-20 LIME STATION ELECTRICAL ELEVATION <br />05018-E-21 SDP MCC ROOM SECTION <br />ELECTRICAL (INSTALLATION OF VFD AT WARREN'S PUMP STATION <br />D1-7-001 WARREN'S PUMP STATION ELECTRICAL SYMBOLS <br />D1-7-007 WARREN'S PUMP STATION ELECTRICAL ONE-UNE DIAGRAM <br />DI-7-010 WARREN'S PUMP STATION 480V AND CONTROLS PLAN <br />DI-7-012 WARREN'S PUMP STATION MOTOR CONTROL CENTER (MCC-A) PLAN AND ELEVATION <br />GENERALLEGEND <br />DESIGNATION DISCIPLINE <br />X <br />F <br />D <br />G <br />C <br />A <br />S <br />M <br />P <br />E <br />H <br />I <br />SECTION LETTER <br />zdf? - <br />DRAWING WHERE <br />DRAWN <br />DRAWING INDEX AND LEGEND <br />FLOW SHEETS <br />P & ID'S <br />GENERAL ARRANGEMENTS <br />CML <br />ARCHITECTURAL <br />STRUCTURAL <br />MECHANICAL <br />PIPING <br />ELECTRICAL <br />HVAC <br />INSTRUMENTATION <br />SECTION LETTER <br />DETAIL or DETAIL NUMBER <br />SECTION AA <br />SCALE: SCALE <br />DRAWING WHERE CUT <br />INSTRUMENTATION <br />05018-1-01 SCADA / CCTV SITE BLOCK DIAGRAM <br />05018-1-02 SCADA / CCTV CURRENT ADDITION BLOCK DIAGRAM <br />05018-I-07 MCNULTY LIME STATION SCADA CONTROL PANEL LAYOUT <br />05018-I-08 McNULTY UME STATION SCADA CONTROL PANEL WIRING <br />05018-1-11 SLUDGE DENSIFCATION PLANT SCADA CONTROL PANEL DOOR <br />05018-1-12 SLUDGE DENSIFICATION PLANT SCADA CONTROL PANEL LAYOUT <br />05018-1-13 SLUDGE DENSIFICATION PLANT SCADA CONTROL PANEL WIRING <br />® 05018-1-14a SLUDGE DENSIFICATION PLANT SCADA EXPANSION MODULES WIRING <br />05018-1-14b SLUDGE OENSIFICATION PLANT SCADA EXPANSION MODULES WIRING <br />05018-1-15 SLUDGE DENSIFICATION PLANT SCADA CONTROL PANEL TB1 WIRING <br />05018-1-16 SLUDGE DENSIFICATION PLANT SCADA CONTROL PANEL TB2 WIRING <br />05018-1-17 SLUDGE DENSIFICATION PLANT SCADA CONTROL PANEL TB3 WIRING <br />05018-I1-18 SLUDGE DENSIFICATION PLANT SCADA CONTROL PANEL TB4 WIRING <br />05018--19 SLUDGE DENSIFICATION PLANT SCADA CONTROL PANEL TB5 WIRING <br />05018-I-20 SLUDGE DENSIFICATION PLANT SCADA CONTROL PANEL TB6 WIRING <br />® 05018-I-21 SLUDGE OENSIFICATION PLANT SCADA CONTROL PANEL TB7 WIRING <br />05018-1-30 3 DAM PUMP STATION SCADA CONTROL PANEL DOOR <br />05018-1-31 3 DAM PUMP STATION SCADA CONTROL PANEL LAYOUT <br />05018-1-32 3 DAM PUMP STATION SCADA CONTROL. PANEL WIRING <br />05018-1-33 3 DAM PUMP STATION SCADA RTD MODULES WIRING <br />05018-1-34 3 DAM PUMP STATION SCADA CONTROL PANEL TB1 WIRING <br />05018-1-35 3 DAM PUMP STATION SCADA CONTROL PANEL T82 WIRING <br />05018-1-36 3 DAM PUMP STATION SCADA CONTROL PANEL T133 WIRING <br />05018-1-37 3 DAM PUMP STATION SCADA CONTROL PANEL TB4 WIRING <br />05018-1-38 3 DAM PUMP STATION SCADA CONTROL PANEL T85 WIRING <br />05018-1-39 3 DAM PUMP STATION SCADA CONTROL PANEL TB6 & TB7 WIRING <br />05018-1-41 7A RISER STATION SCADA CONTROL PANEL LAYOUT <br />05018-1-42 7A RISER STATION SCADA CONTROL PANEL WIRING <br />® 05018-1-43 KOKOMO BRIDGE STATION SCADA CONTROL PANEL LAYOUT <br />05018-1-44 KOKOMO BRIDGE STATION SCADA CONTROL PANEL WIRING <br />05018-1-45 WARREN'S PUMP STATION (WPS) SCADA CONTROL PANEL LAYOUT <br />05018-1-46 WARREN'S PUMP STATION SCADA CONTROL PANEL WIRING <br />05018-1-50a LIME STATION CONTROL LOOP 200 (SHEET 1 OF 3) <br />05018-1-50b LIME STATION CONTROL LOOP 200 (SHEET 2 OF 3) <br />05018-1-50c LIME STATION CONTROL LOOP 200 (SHEET 3 OF 3) <br />05018-1-51 LIME STATION CONTROL LOOP 201 <br />05018-1-52 LIME STATION CONTROL LOOP 202 <br />05018-1-53 LIME STATION CONTROL LOOP 203 <br />05018-1-54 SLUDGE DENSIFICATION PLANT CONTROL LOOP 300 <br />05018-1-55 SLUDGE DENSIFICATION PLANT CONTROL LOOP 305 <br />05018-1-56 SLUDGE DENSIFICATION PLANT CONTROL LOOP 310 <br />05018-1-57 SLUDGE DENSIFICATION PLANT CONTROL LOOP 320 <br />05018-1-58 SLUDGE DENSIFICATION PLANT CONTROL LOOP 323 <br />05018-1-59 SLUDGE DENSIFICATION PLANT CONTROL LOOP 327 <br />05018-1-60 SLUDGE DENSIFICATION PLANT CONTROL LOOP 328 <br />05018-1-61 SLUDGE DENSFICATION PLANT CONTROL LOOP 330 <br />05018-1-62 SLUDGE DENSIFICATION PUNT CONTROL LOOP 401 <br />05018-1-63 SLUDGE DENSIFICATION PLANT CONTROL LOOP 420 <br />05018-1-64 SLUDGE DENSIFICATION PLANT CONTROL LOOP 450 <br />05018-1-65 SLUDGE DENSIFICATION PLANT CONTROL LOOP 455 <br />05018-1-66 SLUDGE DENSIFICATION PLANT CONTROL LOOP 500 <br />05018-1-67 SLUDGE DENSIFICATION PLANT.CONTROL LOOP 501 <br />05018-1-68 SLUDGE DENSIFICATION PUNT CONTROL LOOP 502 <br />05018-1-69 SLUDGE OENSIFICATON PLANT CONTROL LOOP 504 <br />05018-1-70 SLUDGE DENSIFICATION PLANT CONTROL LOOP 505 <br />05018-1-71 SLUDGE DENSIFICATION PLANT CONTROL LOOP 510 <br />05018-1-72 SLUDGE DENSIFICATION PLANT CONTROL LOOP 520 <br />05018-1-73 SLUDGE DENSIFICATION PLANT CONTROL LOOP 522 _ <br />05018-1-74 SLUDGE OENSIFICATION PLANT CONTROL LOOP 527 <br />05018-I-75 SLUDGE DENSIFICATION PUNT CONTROL LOOP 540 <br />05018-I-76 SLUDGE DENSIFICATION PLANT CONTROL. LOOP 541 <br />05018-1-77 SLUDGE DENSIFICATION PLANT CONTROL LOOP 600 <br />05018-1-78 SLUDGE DENSIFICATION PLANT CONTROL LOOP 610 <br />05018-1-79 SLUDGE DENSIFICATION PLANT CONTROL LOOP 634 <br />05018-1-80 SLUDGE DENSIFICATION PLANT CONTROL LOOP 635 <br />05018-1-81 SLUDGE DENSIFICATION PLANT CONTROL LOOP 636 <br />05018-1-82 SLUDGE .DENSIFICATION.P_LANT_CONTROL LOOP 645 <br />05018-1-83 SLUDGE DENSIFICATION PLANT CONTROL LOOP 660 <br />05018-1-84 SLUDGE DENSIFICATION PLANT CONTROL LOOP 661 <br />05018-1-85 SLUDGE DENSIFICATION PLANT CONTROL LOOP 662 <br />05018-1-86 3 DAM PUMP STATION CONTROL LOOP 703 <br />05018-1-87 3 DAM PUMP STATION CONTROL LOOP 706 <br />05018-1-88 3 DAM PUMP STATION CONTROL LOOP 713 <br />05018-1-89 3 DAM PUMP STATION CONTROL LOOP 714 <br />05018-1-90 3 DAM PUMP STATION CONTROL LOOP 715-717 <br />05018-1-91 3 DAM PUMP STATION CONTROL LOOP 718-720 <br />05018-1-92 3 DAM PUMP STATION CONTROL LOOP 722 <br />05018-1-93 3 DAM PUMP STATION CONTROL LOOP 740 <br />05018-1-94 3 DAM PUMP STATION CONTROL LOOP 745 <br />05018-1-95 7A RISER STATION CONTROL LOOP 750 <br />05018-1-96 3 DAM PUMP STATION CONTROL LOOP 755 <br />05018-1-97 3 DAM PUMP STATION CONTROL LOOP 756 <br />05018-1-98 3 DAM PUMP STATION CONTROL LOOP 757 <br />05018-1-99 3 DAM PUMP STATION CONTROL LOOP 762 <br />© CLIM" MOLYBDENUM <br />A Subsidiary of Phelps Dodge Corporation <br />SLUDGE MANAGEMENT PROJECT <br />DRAWING INDEX AND GENERAL LEGEND <br />ZJKJV7JFX INCORPORATED <br />THIS DRAWING WAS PREPARED BY LYNTEK, ALL OF THE <br />INFORMATION CONTAINED THEREIN IS THE PROPERTY OF <br />LYNTEK AND NO REPRODUCTION CAN BE MADE WITHOUT <br />THE PROPER WRITTEN AUTHORIZATION OF LYNTEK. <br />121207.1345 <br />05018-X-0111 6
The URL can be used to link to this page
Your browser does not support the video tag.