Laserfiche WebLink
From the Division's point of view, the portion of the sentence after the first comma raises alarms, <br />because it could be interpreted as implying that that "anything goes" with respect to topsoil replacement, <br />and that the field construction supervisor would have freedom of choice with respect to decisions <br />pertaining to topsoil replacement thickness. The Division doubts this is what was intended, and the <br />Division requests that the language be deleted or properly qualified. The Division suggests the <br />sentence be revised as follows. <br />The primary `foundation building" element for this approach is the ability to replace <br />variable topsoil depths and/or quality of soil materials depending on site-specific needs, <br />as more specifically described under "Topsoil Redistribution Plan" of this section. <br />b) On amended page 2.05-46, at the end of the 2°d paragraph of the Topsoil Redistribution Plan, <br />narrative states that topsoil will be "redistributed and graded to an average or variable replacement depth <br />shown in Section 4.06". This is confusing because Section 4.06 of Volume 1 was not updated in the <br />TR-72 submittal, and thus does not contain details regarding the variable thickness redistribution plan. <br />Sections of Volume 12 (South Taylor Topsoil Plan) pertaining to topsoil replacement were also not <br />updated in TR-72, and may contain information that will no longer apply, following approval of TR-72. <br />Please delete the reference to Section 4.06 on amended page 2.05-46, or provide a revised Section <br />4.06 that includes a revised, detailed, soil replacement plan. The reference to Section 4.06 should <br />specify which Section 4.06 is intended (presumably Volume 1), and outdated information in <br />Volume 12, Sections 2.05.4 and 4.06 should be amended as warranted. <br />There is no need for the topsoil replacement plan narrative to be spread through multiple sections <br />in multiple volumes; the Division's preference is that the narrative plan be comprehensively <br />addressed within a single section of the application, to be referenced within other sections as <br />warranted. <br />c) The topsoil replacement narrative pertaining to replacement thickness, which begins following the <br />excerpted paragraph from the CDOW letter on amended page 2.05-47, is overly vague and conceptual; <br />additional details and commitments are necessary to provide a plan that will demonstrate conformance <br />with Rule 4.06.4(2)(a). The only reference to specific replacement thickness variation is at the bottom <br />of page 2.05-47, where shallow lifts are described as "less than 8 inches" and thicker lifts are described <br />as "greater than 8 inches". This does not necessarily equate to the "dramatic variation" in topsoil depth <br />recommended in the CDOW letter, and does not provide the detail regarding replacement thickness <br />required by 4.06.4(2)(a). The Division also notes a potentially misleading reference to "the currently <br />approved 8 inch average", in the first sentence on page 2.05-48. The 8 inch average is applicable only to <br />areas within the "original" permit boundary; the currently approved average replacement thickness for <br />the South Taylor revision area is 19.8 inches. <br />Please revise the Topsoil Redistribution Plan narrative beginning on the second half of page 2.05- <br />47, to replace the current conceptual discussion (and misleading reference to currently approved 8 <br />inch average), with a more defined plan. The amended narrative will need to incorporate the <br />concepts discussed, including significant variation in replacement thickness, into a plan that will <br />demonstrate compliance with 4.06.4(2)(a). In addition, please provide a Topsoil Replacement Map <br />or Maps with PMT base covering the entire post-2008 reclamation area, delineating parcels or <br />zones with specified average uniform topsoil replacement thickness. The replacement parcels <br />within which defined optional treatments such as the "soil fence berms" or "thick and thin <br />disarray" might be implemented, should be specified, and the approximate maximum extent of