Laserfiche WebLink
C", C <br />Estimated Bond American Soda Mine Site and Access Road <br />mob/demob $17,057.00 <br />demolition Commercial site $1,420,253.00 <br />back fill and Grade site $16,585.00 <br />finish grade $876.00 <br />back fill Storma water pond $6,332.00 <br />Backfill grade main access $127,184.00 <br />replace top soil commercial site $10,019.00 <br />replace top soil main access road $20,094.00 <br />reveg mine site $125,999.00 <br />revegshrubs&trees $141,993.00 <br />$1,886,392.00 <br />rounded up to the next $1000 $1,887,000.00 <br />Bond Estimates are from the Colorado Division of Minerals and Geology for the <br />American Soda Mine with BLM concurrence. <br />EXHIBIT A