Laserfiche WebLink
-4- <br />12. Primary future {Post-minine) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />X Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Ifabitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />13. Primary aresent land use (check one): <br />?_ Cropland(CR) Pastureland(PL) <br />X Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />_ Wildlife Habitat(W.L) <br />IndustriaL'Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): Material will be mined with excavation equipment, <br />placed in haul trucks or on conveyors, transported to processing equipment on site. <br />15. On Site Processing: X Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Crushing, screening, washing of stockpiled sand and gravel, <br />production of concrete and asphalt, milling to recycle concrete and asphalt. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: _None anticipated <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The purpose of this amendment is to add a slurry wall to the HIBE property (Phase 4), to change the reclamation of the plan for <br />this phase to developed water resources, and to account for processing the materials from the adjacent Parker-Dersham <br />operation.