Laserfiche WebLink
DIVISION I - GENERAL REQUIREMENTS <br />SECTION 01330 - SURVEY DATA <br />PART 1- WORK COVERED <br />1.01 SURVEY REQUIREMENTS <br />A. Construction Stakeout: <br />Perform construction stakeout with qualified, competent personnel. <br />2. Engineer shall establish all temporary benchmarks as found on the drawings. Base all <br />vertical measurements on established control. <br />Stake the slurry trench along its alignment at all beginning and ends of all curves and at <br />50' to 100' stations. <br />B. All survey data developed by Contractor in performing surveys required by the work will be <br />available to the Engineer for examination throughout the construction period. <br />END OF SECTION <br />4/08 Section 01330 - Page 1 of 1