My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-27_REVISION - M1997058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997058
>
2008-05-27_REVISION - M1997058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:01:39 PM
Creation date
5/28/2008 11:13:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
REVISION
Doc Date
5/27/2008
Doc Name
Amendment application
From
Hall-Irwin Corporation
To
DRMS
Type & Sequence
AM2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION I - GENERAL REQUIREMENTS <br />SECTION 01330 - SURVEY DATA <br />PART 1- WORK COVERED <br />1.01 SURVEY REQUIREMENTS <br />A. Construction Stakeout: <br />Perform construction stakeout with qualified, competent personnel. <br />2. Engineer shall establish all temporary benchmarks as found on the drawings. Base all <br />vertical measurements on established control. <br />Stake the slurry trench along its alignment at all beginning and ends of all curves and at <br />50' to 100' stations. <br />B. All survey data developed by Contractor in performing surveys required by the work will be <br />available to the Engineer for examination throughout the construction period. <br />END OF SECTION <br />4/08 Section 01330 - Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.