Laserfiche WebLink
DIVISION 1- GENERAL REQUIREMENTS <br />SECTION 01050 - FIELD ENGINEERING <br />PART 1 - WORK COVERED <br />1.01 SURVEYING <br />The Engineer will field establish horizontal control points. The Engineer shall also provide offset staking <br />of the centerline slurry wall alignments. <br />END OF SECTION <br />4/08 Section 01050 - Page 1 of 1