Laserfiche WebLink
TECHNICAL SPECIFICATIONS <br />KIRBY-DERSHAM PIT SLURRY WALL <br />LINING PROJECT <br />TABLE OF CONTENTS <br />Division 1- General Requirements <br />Section 01050 Field Engineering <br />Section 01070 Abbreviations and Symbols <br />Section 01160 Site Conditions <br />Section 01300 Submittals <br />Section 01330 Survey Data <br />Section 01400 Quality Control <br />Section 01600 Material and Equipment <br />Section 01700 Contract Closeout <br />Division 2 - Site Work <br />Section 02100 Site Preparation <br />Section 02140 Dewatering <br />Section 02168 Slurry Wall Construction <br />Section 02290 Platform and Fill Area Construction <br />Tables <br />Table 1 Materials Quality Control Program <br />PA0134 Hall Irvin Construction\0134.025 Kirby-Dmham Pits\Technical SpecificationsTinal Specifications\TOC.doc April 2008