My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-27_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2008-05-27_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:04 PM
Creation date
5/27/2008 10:00:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
5/27/2008
Doc Name
Letter Application and Public Notice
From
Trapper Mining Inc
To
DRMS
Type & Sequence
TR103
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Map M1 0B, Sheet 3 - 2008 topsoil stripping limits were modified to include stripping in <br />K pit (73.9 acres) and stripping in East A pit (21.6 acres). 2008 topsoil replacement acres <br />totaling 43.4 acres were added to an area west of the current East A pit (same area shown <br />as added regrade on Map MI OA, Sheet 3). <br />Roads have been modified as follows: <br />Map M9, Sheet 2 - the relocation corridor of the Middle Z haulroad is shown on this <br />map. The current Middle Z road will be eliminated as part of the remediation of the small <br />Z pit spoil slide. In addition, a small reroute of F4 road will be added to accommodate F <br />pit advance. This new road length is offset by road length eliminated by previous F pit <br />advance. <br />Map M9, Sheet 3 - Short extensions of the East A roads totaling 1,320 feet have been <br />added. A road (1,300 feet) west ofZ dip pit is also being added. <br />Post mining topography has been modified as follows: <br />Map M12, Sheet 2 has been modified slightly to reflect changes associated with re- <br />contouring efforts in the area of the small Z pit spoil slide. <br />The following drainage and sediment control information is provided: <br />Drainage and sediment control information related to structures in Horse and Deal <br />gulches has been included. This information was initially submitted with PR-6; however, <br />since the work in Horse Gulch needs to be completed this summer, we are including <br />information in the TR-103 submittal. This information includes: <br />Map M51, Sheets 2 and 3, shows disturbance limits (worst case) for Horse Gulch and <br />Deal Gulch. <br />SEDCAD runs for Horse Gulch and Deal Gulch are included. Runs are shown for both <br />the 10 year, 24 hour event and the 25 year, 24 hour event. The runs show that the existing <br />Deal Gulch system is adequate to handle the new, small disturbance. The increased <br />disturbance in Horse Gulch requires an expansion of Horse #1 Pond. The SEDCAD run <br />incorporates this design. <br />A plan view and a cross-sectional view of the expanded Horse #1 are included.
The URL can be used to link to this page
Your browser does not support the video tag.