My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (322)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (322)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:13 PM
Creation date
5/22/2008 10:00:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VII APP 12 CERP Appendix III Cyanide Containment Policy
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W CYANIDE CONTAINMENT POLICY <br />February 2007 <br />CONTAINING CYANIDE SHALL BEO AND THE <br />policy: SOLUTIONS AND ALL <br />N THE VALLEY LEACH FACILITY E POND, BUILDING <br />US BALI: BE <br />WITHI EXTERNAL <br />ASSOCIATED TANVKG PIPELINES. NECESSARY CYRNIDE. <br />INTERCONNECTII <br />FOLLOWED TO. pREVENT THE RELEASE OF <br />Implementation. rocess components involving <br />eration, and maintenance of the An action or reaction <br />Design, construction, op tile anide Containment Policy. o ential effect on cyanide <br />cyanide ewill n b adhere <br />a CC&employee will not occur until the p <br />undertaken by <br />containment is assessed. <br />Education: Department employees and will be <br />This Policy will be distributed to all and&nnPal refreer training. <br />• specifically addressed in new ?n (VLF, ADR, External <br />containment system <br />All employees with access to theanide eneral cyanide containment to tnrnent of the facilities <br />r <br />Pond) will be required to know g that con <br />order that they will not compromise (adversely affect) <br />in <br />actions. <br />Design (containment, transfer, application, storage, and makeup): <br />facilities involving cyanide containment will b reviewedonsultantsby, to <br />Equipment, structures, or to ee, assisted as appropriate by qualified properly qualified CC&V emp y ropriately identified, assessed, and <br />ensure that the risks of cyanide release are appropriately <br />and specifications shall be developed as necessary to <br />minimized or prevented. Designs cyanide. <br />achieve and maintain containment of Construction (implementation of designs): es are reviewed <br />construction will adhere to approved designs unless substantive cer Lions to assure <br />roved. Construction activities will be coordinated with op <br />and app . <br />cyanide containment. <br />September 25, 2006 <br />Doc. # E-034 <br />• Cyanide Containment Policy Response Plan\Cyanide Containment <br />EMS: AGANA/CCV Emergency Revision 03 <br />ents are Uncontrolled <br />G:\EMS\3) Implementation\P Printed ted Doclans\ERP Doc ummenu <br />Policy.doc
The URL can be used to link to this page
Your browser does not support the video tag.