Laserfiche WebLink
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 02 <br />Task description :Replace Topsoil from Upslope Area to BA#2 <br />HOURLY E ..................................................................................................................................................................................... <br />::::: :::::::...................................................................................................................................................................................... <br />QUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $415.07 <br />.......... ' ::::::.......... <br />MATERIAL <br />QUANTITIES ................... <br />...................................... <br />.................................................................. <br />............................... <br />............................ <br />Initial Swell Loose <br />volume : 1,290 B CY factor : 1.250 volume : 1,612 LCY <br /> <br />Source of estimate d volume : Table 2.05.4-If <br />Source of estimated swell factor : CAT Handbook <br /> <br />.; :::;::::;::::::.::::.::< .::....................... <br /> <br /> <br />PRODUCTION <br />HOURLY ..........................................................::: ;;,....f: « <br />:.. :::: <br /> <br />Job Condition Correction Factors <br />::,.......................... <br />:::::: <br />. <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.60 (fnd-so <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,100 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.34 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 420.28 LCY/hr <br /> Adjusted fleet production : 840.56 LCY/hr <br /> <br /> <br /> <br /> <br />............... <br />:::::::................ <br />JOB TIME AND COST <br /> <br /> <br />....................................................... <br />......................................................... <br /> <br /> <br />................................................................. <br />.................................................................. <br /> <br /> <br />....... <br />........... <br />.................... <br /> <br />........................... <br />Fleet size : 2 Dozer(s) Total job time : 1.92 Hours <br />Unit cost : $0.494 /LCY Total job cost : $796 <br />