Laserfiche WebLink
Agency or organization name : Colorado Division Of Reclamation, Mining And Sa <br />Permit or other job action : Permit Renewal 02 <br />Task description : Replace Topsoil from Upslope Area to E-2 <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $415.07 <br />::::::.......... <br />MATERIAL QUANTITIES ........................................................................................................................... ............................... ....................... <br />..... <br />Initial Swell Loose <br />volume : 750 B CY factor : 1.250 volume : 938 LCY <br /> <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION :.::.:............ <br />............................... <br />.......................................................:.:: :.:Correction Factors <br />Job Condition Correction Factors :::............................ :::: Source <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,514.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.60 (fnd-so <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,100 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.34 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 511.93 LCY/hr <br /> Adjusted fleet production : 1,023.85 LCY/hr <br /> <br /> <br />............... <br />JOB TIME AND COST :::::::................ <br />........................................................................................................................... <br />.......................................................................................................................... <br />.................... <br />............................... ............................ <br />Fleet size : 2 Dozer(s) Total job time : 0.92 Hours <br />Unit cost : $0.405 /LCY Total job cost : $380 <br />