Laserfiche WebLink
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 02 <br />Task description : Replace Topsoil from Upslope Area to N-2 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $207.53 Total fleet cost/hour : $415.07 <br />:::::' ::::::....... <br />MATERIAL ....................................................... <br />QUANTITIES <br />.............................. <br />.................................................................................................... <br />Initial Swell Loose <br />volume : 6,300 BCY factor : 1.250 volume : 7,875 LCY <br />Source of estimated volume : Table 2.05.4-1f <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />150 feet <br />910.5 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Drv packed <br />5.00 % (neg) <br />7,100 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />2 Dozer(s) <br />$0.674 /LCY <br />Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshiff/daj <br />Spoil pile : 0.60 (fnd-so <br />Push gradient : 1.11 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.34 <br />Adjusted unit production : 307.80 LCY/hr <br />Adjusted fleet production : 615.61 LCY/hr <br />Total job time : 12.79 Hours <br />Total job cost : $5,310