Laserfiche WebLink
PROJECT IDENTIFICATION <br />Agency or organ <br />Task #: 035 <br />Date : 0412112008 <br />User : JRS <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />ization name : Colorado Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job #: C-96-084 <br />_ County: Las Animas Abbreviation :none <br />Site : Lorencito Canyon Mine Filename : C084-035 <br />sheet 1 of 2 <br />Permit or other job action : Permit Renewal 02 <br />Task description :Replace Topsoil from Stockpile BA#3 to W-5 <br />... <br />............M....................................................................................................................................................................................... <br />HOURLY OU.RLY EQUIPE.NT CO..ST Shift basis : 1 per day <br />Truck/loader team -Truck <br />-Loader <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />uipment Description <br />t 773D (2002) <br />T 990 Series 11(2005) <br />t D9R - 9SU (2005) <br />t D9R - 9SU (2005) <br />T 14H <br />iter Tanker. 5.000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 97 100 50 100 25 25 <br />-Ripper attachment : NA NA 50 0 0 NA <br />Ownership cost/hour : $52.49 $105.80 $62.35 $62.35 $39.60 $21.89 <br />Operating cost/hour : $85.86 $116.75 $51.63 $103.27 $12.13 $8.68 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour : $21.72 $32.96 $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $160.07 $255.52 $146.77 $198.40 $76.20 $64.51 <br />Number of units : 3 1 1 1 1 1 <br />Group subtotals : Work : $735.72 Support : $345.17 Maintenance : $140.71 <br />Total work team cost/hour : $1,221.59 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,640 CCY factor : 1.125 volume : 8,595 LCY <br />Source of quantity take-off : Table 2.05.4-1f <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : <br />Total cost : $0 <br />Truck Bed (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 33.80 LCY <br />Descr.: Earth - dry packed Heaped volume : 45.90 LCY <br />Rated payload : 108,060 pounds Average volume : 39.85 LCY <br />Payload capacity : 42.38 LCY Adjusted volume*: 42.38 LCY <br /> Final truck volume based on number of loader passes : 39.38 LCY <br /> 'truck volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.): -7,100 <br />Rated capacity (nom. heaped) : 11.250 LCY Truck Loader Source <br />Descr.: Loose material - 1 " and over ( 85 - 90%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 0.875 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 9.843 LCY Net correction : 0.830 0.830