Laserfiche WebLink
sheet 1 of 2 <br /> CIRCES Cost Estimatina Software <br /> TRUCK/LOADER TEAM WORK <br />«<: <br /> <br />PROJECT IDENTIFICATION <br />_:. <br />. > ;,: <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 034 State : Colorado Permit/job #: C-96-084 <br />Date : 0412112008 County: Las Animas Abbreviation :none <br />User : JRS Site : Lorencito Canyon Mine Filename : C084-034 <br />Permit or other job action : Permit Renewal 02 <br />Task description : Replace Topsoil from Stockpile BA#3 to W-3 <br />HOURLY EQUIPMENT COST <br />Truck/loader team -Truck <br />-Loader <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Shift basis : 1 perdav <br />773D (2002) <br />T 990 Series 11(2005) <br />` D9R - 9SU (2005) <br />` D9R - 9SU (2005) <br />T 14H <br />ter Tanker. 5.000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 100 88 50 100 25 25 <br />-Ripper attachment : NA NA 50 0 0 NA <br />Ownership cost/hour : $52.49 $105.80 $62.35 $62.35 $39.60 $21.89 <br />Operating cost/hour : $88.21 $102.33 $51.63 $103.27 $12.13 $8.68 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour : $21.72 $32.96 $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $162.42 $241.09 $146.77 $198.40 $76.20 $64.51 <br />Number of units : 2 1 1 1 1 1 <br />Group subtotals : Work : $565.93 Support : $345.17 Maintenance : $140.71 <br />Total work team cost/hour : $1,051.80 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,830 CCY factor : 1.125 volume : 2.059 LCY <br />Material weight : 2,550 pounds/LCY Struck volume : <br />Descr.: Earth - dry packed Heaped volume : <br />Rated payload : 108,060 pounds Average volume : <br />Payload capacity : 42.38 LCY Adjusted volume*: <br />Final truck volume based on number of loader passes <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : <br />Rated capacity (nom. heaped) : 11.250 LCY <br />Descr.: Loose material - 1 " and over ( 85 - 90% <br />Bucket fill factor : 0.875 <br />Adjusted bucket capacity : 9.843 LCY <br /> Truck <br />Altitude adj.: 1.000 <br />Job efficiency : 0.830 <br />Net correction : 0.830 <br />33.80 LCY <br />45.90 LCY <br />39.85 LCY <br />42.38 LCY <br />39.38 LCY <br />Site altitude (ft.) : 7,100 <br />Loader Source <br />1.000 (Cat HB <br />0.830 (1 shift/da, <br />0.830