My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-20_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2008-05-20_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:44 PM
Creation date
5/21/2008 10:30:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
REVISION
Doc Date
5/20/2008
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Peak Project Management
Type & Sequence
RN2
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
........................................................ <br />«. <br />PROJECT IDENTIFICATION <br />Agency or organ <br />Task #: 033 <br />Date : 0412112008 <br />User : JRS <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />ization name : Colorado Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job #: C-96-084 <br />_ County: Las Animas Abbreviation :none <br />Site : Lorencito Canyon Mine Filename : C084-033 <br />sheet 1 of 2 <br />Permit or other job action :Permit Renewal 02 <br />Task description : Replace Topsoil from Stockpile BA#2 to W-2 <br />HOURLY EQUIPMENT COST <br />Truck/loader team -Truck : Cat 773D (2002) <br />-Loader : CAT 990 Series 11(2005) <br />Support equipment -Load area : Cat D9R - 9SU (2005) <br />-Dump area : Cat D9R - 9SU (2005) <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck d Water Tanker. 5.000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 97 100 50 100 25 25 <br />-Ripper attachment : NA NA 50 0 0 NA <br />Ownership cost/hour : $52.49 $105.80 $62.35 $62.35 $39.60 $21.89 <br />Operating cost/hour : $85.75 $116.75 $51.63 $103.27 $12.13 $8.68 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour : $21.72 $32.96 $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $159.96 $255.52 $146.77 $198.40 $76.20 $64.51 <br />Number of units : 3 1 1 1 1 1 <br />Group subtotals : Work : $735.38 Support : $345.17 Maintenance : $140.71 <br />Total work team cost/hour : $1,221.26 <br />.: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,530 CCY factor : 1.125 volume : 8,471 LCY <br />Material weight : 2,550 pounds/LCY Struck volume : <br />Descr.: Earth - dry packed Heaped volume : <br />Rated payload : 108,060 pounds Average volume : <br />Payload capacity : 42.38 LCY Adjusted volume': <br />Final truck volume based on number of loader passes : <br />`truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Correctiol <br />Rated capacity (nom. heaped) : 11.250 LCY Truck <br />Descr.: Loose material - I" and over ( 85 - 90%) Altitude adj.: 1.000 <br />Bucket fill factor : 0.875 Job efficiency : 0.830 <br />Adjusted bucket capacity : 9.843 LCY Net correction : 0.830 <br />Shift basis : 1 per day <br />33.80 LCY <br />45.90 LCY <br />39.85 LCY <br />42.38 LCY <br />39.38 LCY <br />Site altitude (ft.) : 7,100 <br />Loader Source <br />1.000 (Cat HS <br />0.830 (1 shift/da <br />0.830
The URL can be used to link to this page
Your browser does not support the video tag.