Laserfiche WebLink
sheet 1 of 2 <br />Date <br />User <br />04/21/2008 <br />JRS <br />County : Las Animas <br />Site : Lorencito Canyon Mine <br />Permit or other job action : Permit Renewal 02 <br />Task description :Replace Topsoil from Stockpile BA#1 to C-2 <br />....................... <br />: <br />QUIPMENT C::.:..OS ::.T per .......................................................................................... Shift .......................................................................... <br />......... <br />HOURLY E:::.. .... <br />basis : 1 da y <br />Truck/loader team -Truck : <br />-Loader: <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />! 773D (2002) <br />T 990 Series 11 <br />! D9R - 9SU (21 <br />D9R - 9SU (21 <br />T 14H <br />Tanker. 5.000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 94 100 50 100 25 25 <br />-Ripper attachment : NA NA 50 0 0 NA <br />Ownership cost/hour : $52.49 $105.80 $62.35 $62.35 $39.60 $21.89 <br />Operating cost/hour : $82.99 $116.75 $51.63 $103.27 $12.13 $8.68 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour : $21.72 $32.96 $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $157.19 $255.52 $146.77 $198.40 $76.20 $64.51 <br />Number of units : 2 1 1 1 1 1 <br />Group subtotals : Work : $569.90 Support : $345.17 Maintenance : $140.71 <br />Total work team cost/hour : $1,055.78 <br />............. ........ . <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,590 CCY factor : 1.125 volume : 6,289 LCY <br />Material weight : 2,550 pounds/LCY Struck volume : <br />Descr.: Earth - dry packed Heaped volume : <br />Rated payload : 108,060 pounds Average volume : <br />Payload capacity : 42.38 LCY Adjusted volume*: <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : <br />Rated capacity (nom. heaped) : 11.250 LCY <br />Descr.:Loose material - 1 "and over ( 85 - 90% <br />Bucket fill factor : 0.875 <br />Adjusted bucket capacity : 9.843 LCY <br /> Truck <br />Altitude adj.: 1.000 <br />Job efficiency : 0.830 <br />Net correction : 0.830 <br />Abbreviation :none <br />Filename : C084-030 <br />33.80 LCY <br />45.90 LCY <br />39.85 LCY <br />42.38 LCY <br />39.38 LCY <br />Site altitude (ft.) : 7,100 <br />Loader Source <br />1.000 (Cat HB <br />0.830 (1 shift(da, <br />0.830