My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-20_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2008-05-20_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:44 PM
Creation date
5/21/2008 10:30:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
REVISION
Doc Date
5/20/2008
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Peak Project Management
Type & Sequence
RN2
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
........................................................ <br />......................................................... <br />........................................................ <br />. <br />PROJECT IDENTIFICATION <br />Agency or organ <br />Task #: 028 <br />Date : 0412112008 <br />User: JRS <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />................................................................................................................................ <br />................................................................................................................................. <br />................................................................................................................................. <br />ization name : Colorado Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job #: C-96-084 <br />_ County: Las Animas Abbreviation :none <br />Site : Lorencito Canyon Mine Filename : C084-028 <br />sheet 1 of 2 <br />Permit or other job action : Permit Renewal 02 <br />Task description : Replace Topsoil from Stockpile SSP#2 to N-1 <br />HOURLY EQUIPMENT COST :::............................................................................::.:::Shift basis:.::::::.:::1 per day:::::............................. <br />Truck/loader team -Truck <br />-Loader <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />'773D (2002) <br />T 990 Series 11 <br />` D9R - 9U (201 <br />D9R - 9U (201 <br />T 14H <br />Tanker. 5.000 Gal. <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 100 88 50 100 25 25 <br />-Ripper attachment : NA NA 50 0 0 NA <br />Ownership cost/hour : $52.49 $105.80 $62.73 $62.73 $39.60 $21.89 <br />Operating cost/hour : $88.21 $103.32 $51.86 $103.73 $12.13 $8.68 <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 $0.00 <br />Operator cost/hour : $21.72 $32.96 $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $162.42 $242.09 $147.38 $199.24 $76.20 $64.51 <br />Number of units : 2 1 1 1 1 1 <br />Group subtotals : Work : $566.92 Support : $346.62 Maintenance : $140.71 <br />Total work team cost/hour : $1,054.25 <br />.... <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,060 CCY factor : 1.125 volume : 5,692 LCY <br />Source of quantity take-off :Table 2.05.4-1f <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />.....................::::::::::::............................................................................ <br />HOURLY PRODUCTION <br />Truck Caaacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : <br />Descr.: Earth - dry packed Heaped volume : <br />Rated payload : 108,060 pounds Average volume : <br />Payload capacity : 42.38 LCY Adjusted volume*: <br />Final truck volume based on number of loader passes : <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition correctiol <br />Rated capacity (nom. heaped) : 11.250 LCY Truck <br />Descr.: Loose material - 1 "and over ( 85 - 90%) Altitude adj.: 1.000 <br />Bucket fill factor : 0.875 Job efficiency : 0.830 <br />Adjusted bucket capacity : 9.843 LCY Net correction : 0.830 <br />33.80 LCY <br />45.90 LCY <br />39.85 LCY <br />42.38 LCY <br />39.38 LCY <br />Site altitude (ft.) : 7,100 <br />Loader Source <br />1.000 (Cat HB) <br />0.830 (1 shift/day) <br />0.830
The URL can be used to link to this page
Your browser does not support the video tag.