Laserfiche WebLink
• Following construction, seeding will take place on bare soil areas exposed and "affected" during <br />the construction activity, unless the disturbed area is intended as a driving surface (e.g., parking <br />lot or access/haul road). <br />• Inspections will be conducted weekly by the Climax Project Manager (or his designee) during <br />construction activities and at any time when heavy rain or snow is of concern. Inspection logs <br />will be maintained in the office of the Climax Project Manager or the Climax Environmental <br />Department. <br />• Oil products or other potentially hazardous materials used in this project will be kept in <br />appropriately labeled containers and will be used in such a manner to avoid or minimize contact <br />with rain and snow. Should the construction contractor bring oil or other potentially hazardous <br />materials on this project site in quantities exceeding 55 gallons, a spill plan will be required to <br />comply with 40 CFR Part l 12. <br />