My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-15_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2008-05-15_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:36 PM
Creation date
5/16/2008 2:44:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
5/15/2008
Doc Name
Review Memo
From
Dan Mathews
To
Marcia Talvitie
Type & Sequence
TR57
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />DIVISION O F <br />RECLAMATION <br />MINING <br />- &- <br />SAF ETY <br />DRMS INTERNAL MEMORANDUM Bill Ritter, jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />TO: Marcia Talvitie Ronald W. Cattany <br />FROM• Dan Mathews Division Director <br />• Natural Resource Trustee <br />DATE: May 15, 2008 <br />RE: New Horizon Mine (Permit No. C-81-008) <br />TR-57; Soil Resource Information, Soil Handling, and Prime <br />Farmland <br />I have reviewed the referenced revision application, including amended text, tables, and appendices <br />of Section 2.04.9 (Soils Resource Information) and Section 2.05.4(2)(d) (Topsoil Redistribution). I <br />also reviewed the amended maps 2.04.9-1 (Soil Baseline Map) and 2.05.4-4 (Postmining Topsoil <br />Replacement), and the new Map 2.04.9-2 (Topsoil Balance Map as of February 2008). My <br />comments are itemized below. Please let me know if you have any questions. <br />Section 2.04.9 (Soil Resource Information text, tables, appendices, and maps) <br />1. The two maps included in the Section 2.04.9 submittal are not listed in the Table of <br />Contents. Please revise the Table of Contents to list Maps 2.04.9-1 and 2.04.9-2. <br />2. In Table 2.04.9-1 (Procedures and Analytical Procedures Utilized for [Premine] Topsoil <br />Analysis), on page 2.04.9-11, it is indicated that physical characteristics of each sampled <br />profile were described and recorded. This information does not seem to have been included <br />in the Section 2.04.9 tables or attachments, and needs to be provided to supplement the soil <br />laboratory data. Please provide this information for inclusion in the application if <br />available. <br />3. Soil analytical data from the 1998 study is included in Appendix 2.04.9-7, referenced in <br />narrative page 2.04.9-12. On Attachment page 2.04.9-7-11 the columns are shifted or <br />misaligned, such that some of the parameter listings do not fall under the appropriate column <br />heading, making the data on that page difficult to interpret. Please provide a revised <br />Attachment page 2.04.9-7-11, with columns correctly aligned beneath appropriate <br />headings. <br />4. The suitability levels for coarse fragment content for Prime Farmland Lift B and Single-Lift <br />Soils in Table 2.04.9-2 will need to be further explained and documented. Typical upper <br />limit recommendations for root zone coarse fragment content are in the range of 30% to <br />Office of Office of <br />Mined Land Reclamation Denver Grand Junctjon Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.