Laserfiche WebLink
The forms shall be installed vertically. The deviation from vertical shall not exceed one <br />(1) inch. <br />3.4.3 Embedded Items. <br />Portions of items embedded in concrete shall e free of oil, dirt, loose mill scale, rust and <br />debris at the time the concrete is placed. Such material shall be removed by rubbing with <br />burlap. <br />3.5 Quality Control <br />The Engineer shall visually inspect the formwork installation for fit-up and dimensionally for <br />location, together with any embedded items prior to placement of concrete. <br />End of section <br /> <br />n <br />U <br />