My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-21_REVISION - M1977300 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2008-04-21_REVISION - M1977300 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:28:21 PM
Creation date
5/16/2008 9:42:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REVISION
Doc Date
4/21/2008
Doc Name
Steve Level Adit Bulkheads/ As-Built Documentation Package
From
Cotter Corp.
To
DRMS
Type & Sequence
TR10
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project, Steve Adit Tunnel Bulkhead, As-Built By MEL/JFA Date 10/29/08 <br />Sta.2+65 Sheet 2 of 8 <br />10' Thick, 7'-7" Wide, 8'-2" High, <br />#6 Rebar <br />Notation continued: Inputs continued: <br />• <br /> <br />V ~ =nominal concrete shear strength (lb/ft) <br />V„ =factored concrete shear strength (lb/ft) <br />vs = rebar shear stress (psi) <br />W =total bulkhead load (lb) <br />Z =height of rock to prevent hydrofrac (ft) <br />°ovb =overburden rock stress per ft depth (ft) <br />wfs =factored static fluid bulkhead load (psf) <br />~fse =factored static fluid bulkhead <br />earthquake load (psf) <br />~fle =factored line-of--sight fluid <br />earthquake bulkhead load (psf) <br />cage =factored concrete bulkhead <br />earthquake load (psf) <br />Bulkhead length for allowable hydraulic pressure gradient: <br />Maximum (design) hydraulic pressure, p := H 44w psi p = 52 psi <br />Bw'~w <br />Minimum contact grout pressure, Qmingp ~= 144 psi 6mingp - 49.8 psi <br />2•Bw'^rr <br />Maximum contact grout pressure, 6maxgp ~= 144 psi 6maxgp - 260 psi <br />Allowable 41 psi/ft pressure gradient for low-pressure grouting of upper part of concrete/rock contact: <br />Required bulkhead thickness for low-pressure contact grouting, Lhp := 4 ft Lhp = 1.27 ft <br />Load increase design factors <br />Fluid static load, ifs := 1.40 <br />Earthquake acceleration of static fluid ~fe := 1.05 <br />load, <br />Earthquake acceleration of line-of--sight lea := 1.40 <br />impounded fluid and bulkhead loads, <br />vi1 =nominal limiting shear stress, wb/Lt<2 (psi) <br />vi2 =nominal limiting shear stress, wb/Lt = 2-5 (psi) <br />aS =flexural stress (psi) <br />6n,;ngp =minimum contact grout pressure (psi) <br />6m~gp =maximum contact grout pressure (psi) <br />Depth below surface to prevent hydrofrac of rock around tunnel: <br />Available formation breakdown pressure, <br />Overburden pressure, per ft of depth, <br />Height of rock to prevent hydrofrac, <br />Bp := p <br />1'r <br />Dovb ~= 144 <br />Z := Bp <br />2' Dovb <br />Bp = 52 psi <br />Dovb = 1.132 psi/ft <br />Z = 23 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.