My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-02_REVISION - M1981021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981021
>
2008-05-02_REVISION - M1981021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:31 PM
Creation date
5/15/2008 10:41:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981021
IBM Index Class Name
REVISION
Doc Date
5/2/2008
Doc Name
Revised Bons Estimate and Approval
From
DRMS
To
Denison Mines
Type & Sequence
TR5
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />,:. <br />PROJECT IDENTIFICATION <br />Task # : 02R State :Colorado Permit/job# : M-1981-021 <br />Date <br />User <br />05/02/2008 <br />RCO <br />County :San Miguel Abbreviation :none <br />Site :West Sunday Mine Filename : M021-02R <br />Agency or organization name : DRMS <br />Permit or other job action : TR-5 update <br />Task description :Spread topsoil from SWstockpile <br />;. <br />..:.. >. <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRGI <br />volume : 824 LCY factor : NA volume : 824 LCY <br />Source of estimated volume : TR-5 adequacy response <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Loose stockpile Spoil pile : 0.70 (fnd-m~ <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat Ht3) <br />Average site altitude : 5,800 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.47 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 995.03 LCY/hr <br /> Adjusted fleet production : 995.03 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 0.83 Hours <br />Unit cost : $0.209 /LCY Total job cost : $172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.