My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-13_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2008-05-13_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:32 PM
Creation date
5/14/2008 10:08:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
5/13/2008
Doc Name
3rd Adequacy Review Letter
From
DRMS
To
Colowyo Coal Company
Type & Sequence
RN5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Built Certification and Pond Construction Report for the Section 28 Pond <br />as a Technical Revision. The two reports can be submitted under the <br />same revision. <br />3. Currently Colowyo has six outstanding stipulations (Stipulation 2, 3, 4, 7, 9 <br />and 10). Three of these stipulations have been complied with since the <br />Division's last adequacy review letter (Stipulation 5, 6 and 8). <br />a. Response Accepted. Stipulation 2 is a future commitment. <br />b. Response Accepted. Stipulation 3 is a future commitment. <br />c. Response Accepted. Stipulation 4 is a future commitment. <br />d. Stipulation 5 has been complied with. Colowyo submitted Technical <br />Revision 70, which addressed Stipulation 5, on 7 March 2008. The <br />revision was deemed complete on 14 March 2008 and the Division sent <br />Colowyo a preliminary adequacy letter on 31 March 2008. The Division <br />is awaiting Colowyo's response to the PAR letter. The proposed decision <br />date for Technical Revision 70 is 30 May 2008. <br />e. Stipulation 6 has been complied with. Colowyo submitted Minor <br />Revision 88 on 9 July 2007. The Revision was approved on 20 August <br />2007. <br />f. Stipulation 7 deals with the points of compliance for the Colowyo Mine. <br />The Division and Colowyo met on 26 February 2008 and discussed the <br />need for a detailed analysis regarding points of compliance at the Colowyo <br />Mine. It was agreed that Colowyo would submit this analysis to the <br />Division no later than 31 July 2008. <br />g. Stipulation 8 has been complied with. On 14 March 2008 Colowyo <br />submitted Technical Revision 72, which addressed Stipulation 8. The <br />revision was deemed complete on 21 March 2008 and the Division sent <br />Colowyo a preliminary adequacy letter on 29 Apri12008. The Division is <br />awaiting Colowyo's responses to the PAR letter. The proposed decision <br />date for Technical Revision 72 is 20 May 2008. <br />h. Response Accepted. Stipulation 9 is a future commitment. <br />i. Response Accepted. Stipulation 10 is a future commitment. <br />4. Response Accepted. These items have been included with Colowyo's <br />Technical Revision 72 submittal. See item " 3d" above for more details. <br />5. Response Accepted. This item has been included with Colowyo's Technical <br />Revision 72 submittal. See item " 3d" above for more details. <br />Colowyo C-1981-019 2 Permit Renewal 05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.