Laserfiche WebLink
ry ~ ' - <br />STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department or Natural ResourtEs <br />1313 Sherman St., Room 275 `,~** <br />® <br />Oenver, Colorado 80203 ~~~~,' it G C O L O R A b O <br />Phone: (303) 8663567 D[ Y[ S r o N O F <br />RECLAMATION <br />FAx: ao3) 832-a,o6 <br />2 2008 <br />1 MINING <br /> . <br />MAY sA>:~TY <br /> n of Keciamation, <br />i <br /> o <br />Divis <br />and Safety asl Dwane <br />REQUEST fOR TRANSFER OF COA L PERI~~ID SUCCESSION OF OPE RA 4 <br /> Rustalt Ceorae <br /> I EzeorGva Oinxtor <br /> Ronald W. CaUany <br /> RECITALS option Din2dor <br /> Natural Bewares Ttuuee <br />A. On November ~ 2002 ,the Mined Land Reclamation Board of the Colorado <br />Department of Natural Resources (the "State"d granted to <br />Lorencito Coal Company, LLC <br />address <br />4422 Bryan Station Road, Lexington, RY 40516 ("Permlttee"~ permit <br />number C-1996-084 (the "Permit's pursuant to which Permiti~ee has been cAnducting a mining and <br />reclamation operation known as Lorencito canyon nine in the County of <br />Las animas ,State of Colorado. <br />B. Permittee wishes to assist tho pormit to <br />New Blk Coal Company, LLC address <br />122 Weat First Street, Trinidad, Colorado 81082 aS Successor <br />Operator ("Successor") and Successor wishes to become Successor Permitbee under tht permit. <br />C. Successor understands that the reclamation plan (tho "Plank required by rho permit and by applicable <br />State laws and regulations has not been completed and is willing to assume full responsibility for the <br />completion of the Plan. <br />ti. <br />AGREEMENTS <br />Permittee and Successor hereby agree, for their own benefit and for the beTtfit of the State, such <br />agreements to be effcctivc ipso facto upon the approval by the State of the transfer of the Permit from <br />Permittee to Successor, as follows: <br />I . Successor has inspected the mining and reclamation operations to i¢ entire satisfaction and is <br />fully aware of the condition thereof. Successor understands and accep¢ all of the conditions of the Permit. <br />2_ Successor will complete the reclamation plan, and hereby assumes liability for completing <br />such plan as to all areas heretofnre disturbed, as well as to all areas hereaft>;r disturbed. Successor will perform <br />aU of the obligations of the Permittee under the Permit which have not heretofore been performed by <br />Permittee. <br />Office of O~ ~ <br />Mined Land Reclamation Acdve and Inactive Mines <br />