My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-12_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2008-05-12_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:30 PM
Creation date
5/13/2008 9:47:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
5/12/2008
Doc Name
Preliminary Adequacy Review
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR71
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a time as the Section 21 Pond is constructed. As such, the ditch has been <br />reconfigured and moved from approximately Station 45+00 to its end-point. <br />This moves the ditch approximately 250 feet to the southeast of its current <br />location. This move increases the area of the contributing watershed and <br />catches the additional disturbed area runoff and diverts it to the Section 16 <br />Pond. The Division has some concerns with the design of the Section 16 Pond <br />ditch extension. Specifically, there are two 90° bends in the reconfigured <br />ditch, one changing the direction of flow to the southeast at approximately <br />Station 45+00 and the other changing the direction of flow to the southwest at <br />approximately Station 48+00. These extreme angles are generally areas that <br />can cause stability problems for ditches. Please describe for the Division <br />and include in the text for Exhibit 7, Item 140, how Colowyo plans to <br />address the possible stability problems at these two 90° bends in the ditch <br />extension. <br />5. When Colowyo completes construction on the new Section 16 Pond extension <br />ditch, there will be a portion of the "old" Section 16 Pond (first) extension <br />ditch that will remain to the northwest of the new extension. The portion that <br />will remain is from approximately Station 45+00 to Station 55+00 on the <br />currently approved Figures 1 and 2. If the "old" portion of the Section 16 <br />Pond ditch is not reclaimed it could cause major maintenance problems with <br />the remaining portion of the ditch north of Station 45+00. The Division <br />believes that this "old" portion of the ditch should be reclaimed concurrent <br />with the new ditch being constructed. Please provide the Division with <br />details regarding Colowyo's plans for the "old" portion of the Section 16 <br />Pond ditch that will not be needed after the construction of the second <br />extension is complete. <br />This concludes the preliminary adequacy review for the Colowyo Mine's Technical <br />Revision 71. The proposed decision date for this revision is 6 June 2008. In order to <br />meet this date, Colowyo's prompt responses to this adequacy review are requested. <br />Please contact me at (303) 866-4929 if you have any questions or comments. <br />Sincerely, <br />James R. Stark <br />Environmental Protection Specialist <br />cc: Sandy Brown <br />
The URL can be used to link to this page
Your browser does not support the video tag.