Laserfiche WebLink
EXHIBIT B <br />Gosne~ and Sons, Inc. <br />Plan f'o,r Augmentation <br /> <br /> <br />Period <br />Gravel' <br />AF <br />ConcreteZ <br />AF <br />Dust Control3 <br />AF Pond <br />Evapo:ration4 <br />AF Water Saless <br />AF Wash Plantb <br />AF Net <br />Augmentation <br />Requirement <br />AF <br />Month: <br />Week 1 <br />Week 2 <br />Week 3 <br />Week 4 <br />Week 5 <br />Gravel: Tons x 1.28 _ 43,560 <br />ZConcrete: Cubic Yards x 30 gallons = 325,851 gallons/AF <br />3Dust Control: gallons -325,851 gallons/AF <br />4Pond Evaporation: Inches from Table 1 x acres from Elevation Capacity Tables 2 and 3 - 12 <br />SWater Sales: Gallons ~ 325,851 gallons / AF <br />6Wash Plant: Hour of operation x 30,000 = 325,851 /gallons / AF <br />Net Augmentation: Add 1 thru 6 <br />i <br />..~1 <br />_i <br />