Laserfiche WebLink
5.0 TECHNICAL REVISION -NEW MILL AND ACCESSORY BUILDINGS <br />The process facilities will be designed to treat a no-ninal 28,000 tons per day (tpd) of molybdenum sulfide ore, <br />producing a Grade B molybdenum concentrate that will be shipped offsite for further treatment. A complete <br />description of facilities associated with the new mill is fully presented in section 6 and 8 of the attached <br />Feasibility Report. <br />The new milling equipment will consist of typical molybdenum milling process equipment, as illustrated on the <br />following figure. This figure, which is a feasibility-level (draft) drawing, also outlines the proposed new mill <br />footprint and equipment layout. Professional Engineer-stamped final drawings will be submitted when they <br />become available. <br />