3.0 TECHNICAL REVISION -TAILING DELIVERY LINE <br />Tailing delivery and deposition for the Climax 2010 mine startup will utilize the existing Tenmile <br />Tailing Storage Facility (TSF). A replacement tailing delivery line (TDL) will be installed from the <br />Mill discharge sump to the Tenmile TSF. The TDL will generally follow the existing East Tailing <br />Delivery Line (ETDL) route. Tailing will be deposited utilizing the upstream deposition method by <br />operation of a header and spigot system along the dam crest. The deposition system will incorporate <br />rotational upstream deposition through relatively short spigots along the dam crest during the warmer <br />months and single-point leadoff deposition into the TSF pond during the colder months. <br />A new 36-inch diameter high-density polyethylene (HDPE) TDL will be installed from the Mill to the <br />Tenmile TSF, which will generally follow the existing ETDL route. The existing 42-inch diameter <br />reinforced concrete pipe (RCP) TDL will be rehabilitated and utilized to convey tailing from the <br />Tenmile TSF to the Mayflower TSF. There are 22 existing drop structures in the pipeline route where <br />the line is supported by steel stusses between the hillside and the drop structures. <br />For initial tailing deposition, a starter deposition berm will be constructed along the dam crest. <br />Approximately 2.5 years of tailing production (26 million tons) will initially be deposited on Tenmile at <br />which time deposition will move to the Mayflower TSF. The existing ETDL will continue to be <br />utilized to convey the impacted water sources to the Sludge Densification Plant (SDP) and will also <br />serve as an emergency tailing conveyance line should the main delivery line from the Mill to the first <br />discharge point~'have to be taken out of service for a short period. <br />Proposed TDL construction details are illustrated on Figures 1 through 1 I below. <br />