My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (347)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (347)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
5/12/2008 10:31:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VII APP 12 Appendix D Cyanide Containment Policy
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ IDE CONTAINMENT POLICY <br />CYAN <br />February 2007 <br />TAINING CYANIDE 5HALLIBDE11CG AND THE <br />policy: SOLUTIONS CON AND ALL <br />N THE VALLEY LEACH FAC Tpg~,GE POBND, BALI: BE <br />WITHI EXTERNAL S <br />ASSOCIATED TANVKG PIPELINES. NECESSAR CYANIDE•U~S <br />INTERCONNECTII <br />OLLOWED T~ PREVENT THE RELEASE OF <br />F <br />Implementation. rocess components involving <br />eration, and maintenance of the An action or reaction <br />Design, construction, op anide Containment Policy. o ential effect on cyanide <br />cyanide en b da CC&V mployee will not occur until the p <br />undertak y <br />containment is assessed. <br />Education: artment employees and will be <br />This Policy will be distributed to aIl and&nriPal refresher training. <br />• specifically addressed in new min stem (VLF, ADR, External <br />anide containment sy <br />All employees with access to the eneral cyanide containment t~nrnent wthh iheirlttes <br />Pond) will be required to know g that con <br />' order that they will not compromise (adversely affect) <br />in <br />actions. <br />ontainment, transfer, application, storage and 11°~eup)~ <br />Design (c <br />'lities involving cyanide containme uawli~ed consultants, to <br />Equipment, structures, or face to ee, assisted as appropriate by q <br />properly qualified CC&V emp y ro riately identified, assessed, and <br />ensure that the risks of cyanide release are aPP p <br />esi ns and specifications shall be developed as necessary o <br />minimized or prevented. D g anide. <br />achieve and maintain containment of cy <br />Construction (implementation of designs): es are reviewed <br />roved designs unless substantive cer Lions to assure <br />Construction will adhere to app <br />roved. Construction activities will be coordinated with op <br />and app . <br />cyanide containment. <br />September 25, 2006 <br />Doc. # E-034 <br />• Cyanide Containment Policy Res onse Plan\Cyanide Containment <br />EMS: AGANA/CCV ency P Revision 03 <br />G:\EMS\3) Implementation\Plans\ERP\Cyanide Emerg <br />Printed Documents are Uncontrolled <br />Policy.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.