My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (316)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (316)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
5/12/2008 10:30:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VII APP 12 CERP Cyanide Emergency Response Plan
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• and multiple gas meters) are available either through Process personnel, Safety, or the Mine <br />Rescue Team. <br />VI. Notification <br />All notification should be done in accordance with the Emergency Response Procedures (ERP). <br />All contact information for both internal and external contacts can be found in the ERP under the <br />CONTACTS tab. ~ <br />VII. Monitoring and Remediation <br />Releases to the Land <br />All releases of cyanide or cyanide solution to the land will be cleaned up as soon as practicable. <br />Spills of solid cyanide will be picked up by shovel such that all visible cyanide is recovered. <br />Releases of cyanide solution shall be recovered if practicable, treated in place and contaminated <br />soil shall be excavated. Ponded solution shall be recovered for use in the leaching process if <br />possible. Remaining contamination on the soil surface shall be treated with sodium hypochlorite <br />solution to oxidize the cyanide to less toxic cyanate. <br />Where ground conditions allow, the extent of contamination resulting from a release of cyanide <br />solution will be determined visually. After treatment, solution spills will be over-excavated to <br />remove all wet soil. <br />Where soil already was wet prior to the release or in other situations where the extent of potential <br />contamination can not be determined visually, CC&V initially shall excavate soil believed to be <br />contaminated. <br />Contaminated soil shall be placed on the VLF for recovery/use of any. remaining reagent values, <br />or disposed of in compliance with applicable hazardous waste regulations. <br />A report of the spill and its remediation shall be retained in the files of the Environmental <br />Resources Department. <br />Releases to Surface Water <br />In the unlikely event that, cyanide solution is released to Arequa Gulch, CC&V shall sample the <br />solution released (if possible), at established surface water sampling locations, and downstream <br />from but as close to the point of entry of the release as is safely possible. Standard sampling, <br />preservation, handling, and analytical methods shall be used and coordinated by a member of the <br />CC&V Environmental Resources Department. <br />In no case shall CC&V attempt to oxidize, neutralize, or otherwise treat cyanide once it has <br />entered Arequa Gulch. Since all cyanide treatment chemicals are themselves toxic to aquatic <br />life, and in situ treatment is only marginally effective at best, all efforts must focus on preventing <br />releases to surface waters. ' <br />• Cyanide Emergency Response Plan September 25, 2006 <br />EMS: AGANA/CCV Doc.# E-012 <br />S:\4010-00055 CC & V 112(d) Permit Application\ERP, SPCC, FMP\Cyanide Emergency Response Plan.doc Revision 03 <br />-I1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.