My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (311)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (311)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
5/12/2008 10:23:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VII APP 12 CC&V Spill Response Plan (SPCC) & Appendix A
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.7.2 Professional Engineer's Certification <br />• I, Michael D. Ellis, P.E., hereby attest that I am familiar with the CC&V Facility and I also understand <br />the Rules and Regulations promulgated under 40 CFR Part 112 Oil Pollution Prevention and how they <br />apply. Furthermore, I personally visited the Site on March 31 and April 1, 2003 for the purposes of <br />gathering information in order, to prepare this SPCC Plan. The SPCC Plan has been. prepared in <br />accordance with good engineering practice, including considerations given for applicable industry <br />standards as well as the requirements of 40 CFR Part 112. Procedures for inspecting and testing the <br />tanks and containers have been established and are herein incorporated. Based on my professional <br />engineering judgment, this SPCC Plan is adequate for the CC&V Facility. <br />This certification in noway relieves the owner or operator of the facility ofhis/her duty to prepare arid <br />fully implement this SPCC plan in accordance with the requirements of 40 CFR Part 112. This plan <br />is valid only to the extent that the facility owner or operator maintains, tests, and inspects equipment, <br />containment, and other devices as prescribed in this Plan. j <br />• <br />Michael D. Ellis, P.E. (Colorado P.E. <br />Registration Number 27101) <br />Date: <br />Seal: <br />• I <br />Spill Response Plan. September 25, 2006 <br />EMS: AGANA/CCVS:\4010-00055 CC & V 112(d) Permit Application\ERP, SPCC, FMP\SRP_05-06.doc Doc. # E-006 <br />S:\4010-00055 CC & V 112(d) Permit Application\ERP, SPCC, FMP\SRP_05-06.doc Revision 03 <br />Printed Copies are Uncontrolled <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.