Laserfiche WebLink
• <br />VLF Ponds. Sediment Ponds. and Stormwater Control Basins Reclamation Costs <br />Sediment and Stormwater Ponds Eqmt Cost Labor cost Material Cost Total cost Comment <br />What are costs from the 2006 DRMS updated version? $ 7,324 $ 3,020 $ 9,899 $ 20,243 see below <br />What is the inflation factor to use to adjust? 1.069518717 1.069518717 1.069518717 <br />Calculated 2008 costs = $ 7,833 $ 3,230 $ 10,587 $ 21,650 <br />Note: Only one additional basin that will have to be reclaimed is scheduled to be constructed for MLE Project. <br />It is located in the Globe Hill Pit area. Its reclamation should be very small in comparison with the total amount <br />for final closure. <br />External Storage Ponds for VLF Eqmt Cost Labor Cost Material Cost Total Cost Comment <br />Detox, Dewater, Sludge Removal from ponds $ 16,270 $ 27,843 $ 110,496 $ 154,609 <br />Reclamation of depressions $ 46,684 $ 10,692 $ 25,047 $ 82,423 <br />SUbtOtal = $ 62,954 $ 38,535 $ 135,543 $ 237,032 <br /> $ 237,032 check <br />What is the inflation factor to use to adjust? 1.069518717 1.069518717 1.069518717 <br />Calculated 2008 costs = $ 67,330 $ 41,214 $ 144,966 $ 253,510 <br /> $ 253,510 check <br />for VLF Ponds + Sediment Ponds and Basins $ 75,164 $ 44,444 $ 155,553 $ 275,160 <br />MDE (4-1-08) <br />• <br />