My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (368)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (368)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
5/12/2008 10:21:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VII APP 11 Reclamation Cost Model to Support MLEP
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Pads 3 and 4 Reclamation Costs (2008 <br />Activity Units Work Hours Eqmt Cost Labor Cost Material Cost Total Cost <br /> <br />'Grading/Re-contouring (ac) 13.65 27.30 $ 5,448 $ 799 included $ 6,247 <br />D9 Rate (hrs/acre) 2 <br />ZHaul Fill (cy) (According to CC&V staff, this work has been completed as of March 2008) <br />3Haul Growth Medium (cy) 11,009 48 $ 10,215 $ 1,535 included $ 11,750 <br />623 Scraper (cy/hr) 230 <br />°Spread Growth Medium (cy) 11,009 15.51 $ 3,094 $ 504 included $ 3,599 <br />D9 Rate(cy/hr) 710 <br />SSoil Analyses (#) 2.73 included included $ 56 $ 56 <br />Rate (ac /sample) 5 <br />°Rip & Fertilize (ac) 13.7 8.03 $ 328 $ 261 $ 1,693 $ 2,282 <br />D4 Rate (aGhr) 1.7 <br />'Seed & Harrow (ac) 1.0 0.43 $ 19 $ 14 $ 105 $ 138 <br />D4 Rate (aGhr) 2.3 <br />Hand Seed (ac) 12.7 12.65 N/A $ 263 $ 1,328 $ 1,591 <br />Rate (aGhr) 1.0 <br />9Hydro-Mulching (ac) 13.7 22.75 $ 1,011 $ 666 $ 1,433 $ 3,110 <br />Rate (aGhr) 0.6 <br />10Plant Trees (ac) 13.65 20.37 N/A $ 424 $ 6,306 $ 6,730 <br />Rate (ac/hr) 0.67 <br />Total Work Hours = 154.91 <br />"Supervisor (work hrs/4) C 38.73 $ 4,283 $ 1,126 included $ 5,409 <br />Subtotals = $ 24,399 $ 5,592 $ 10,922 $ 40,912 <br />Subtotals adjusted for percent completion and mine extensions = 8,540 1,957 3,823 $ 14,319 <br /> Total Reclamation Cost Estimate for Pads 3 8~ 4 = $ 14,319 <br />'Assumes grading will be done with conventional D9 dozer <br />ZAccording to CC&V staff, this reclamation work has been completed as of March 2008 <br />3Growth Medium Replacement fleet will consist of 623 scrapers (3) <br />°Growth Medium will be spread using a D-9 dozer to a depth of 6 inches <br />SSoil analyses will be run on samples of the reclaimed areas to determine optimum fertilizer rates <br />eRipping and fertilizing will be conducted on the replaced growth medium using a conventional D4 dozer with a cyclone spreader <br />Seeding and harrowing will be conducted on all replaced growth medium that is traversible with conventional equipment <br />BAssumes minimal amount of the area will require hand-seeding to achieve revegetation <br />9Mulching will be conducted using conventional hydro-seeder/hydro-mulcher MDE (2-20-08) <br />tOTrees and shrubs will be planted on north and east-facing slopes Rev (4-2-08) <br />'Supervisor costs are figured at 25 percent of the total work hours to accomplish the reclamation effort Rev (4-10-08) <br />
The URL can be used to link to this page
Your browser does not support the video tag.