Sic uaw Gulch Overburden Storage Area Extension Reclamation Costs (2008) <br />Activity Units Work Hours Eqmt Cost Labor Cost Material Cost Total Cost <br />Grading (cy) 5,889,060 6,843 $ 3,197,490 $ 222,663 included $ 3 <br />420 <br />153 <br />D11 Rate (cy/hr) 861 , <br />, <br />ZHaul Gr Medium (cy) 68,956 272 $ 92,515 $ 7,872. included $ 100 <br />386 <br />777 Truck (cy/hr) 253.1 , <br />988 Loader (cy/hr) 1012.4 68 $ 13,585 $ 1,993 included $ 15 <br />579 <br />14 H Grader Fleet hrs/4 68 $ 7,257 $ 2,122 included , <br />$ 8 <br />379 <br />5K gal HZO Truck Fleet hrs/4 68 $ 5,906 $ 1,930 included , <br />$ 7,836 <br />3Spread GrMedium (cy) 68,956 97 $ 19,382 $ 3,160 included $ 22 <br />542 <br />D9 Rate(cy/hr) 710 , <br />'Soil Analyses (#) 17 included included $ 352 $ 352 <br />Rate (ac /sample) 5 <br />SRip & Fertilize (ac) 85.5 50 $ 2,056 $ 1,636 $ 10,602 $ 14 <br />295 <br />D4 Rate (ac/hr) 1.7 , <br />6Seed & Harrow (ac) 76.95 33 $ 1,480 $ 1,089 $ 8,080 $ 10 <br />649 <br />D4 Rate (ac/hr) 2.3 , <br />Hand Seed {ac) 8.55 9 N/A $ 178 $ 898 $ 1 <br />076 <br />Rate (ac/hr) 1.0 , <br />~ydro-Mulching (ac) 85.5 143 $ 4,228 $ 4,117 $ 44,712 $ 53 <br />058 <br />Rate (aGhr) 0.6 , <br />9Plant Trees (ac) 0 - N/A $ - $ _ $ _ <br />Rate (ac/hr) 0.67 <br />Total Work Hours = <br />7 <br />652 <br />, <br />~ <br />10Supervisor (work hrs/4) 1,913 $ 26,109 $ 81,589 included $ 107,698 <br />Subtotals = $ 3,370,009 $ 328,349 $ 64,643 $ 3,763,001 <br /> <br /> Total Reclamation Cost for S uaw Gulch OSA Extension= $ 3,763,001 <br /> <br />Assumes grading will be done with conventional D11 dozers with U blades working as slot dozers where practical <br />2Growth Medium Replacement fleet will consist of 988 loader, 4-777 trucks, 14G grader, and 5000 gal water truck <br />3Growth Medium will be spread using a D-9 dozer to a depth of 6 inches <br />4Soil analyses will be run on samples of the reclaimed areas to determine optimum fertilizer rates <br />SRipping and fertilizing will be conducted on the replaced growth medium using a conventional D4 dozer with a cyclone spreader <br />sSeeding and harrowing will be conducted on all replaced growth medium that is traversible with conventional equip ment <br />Assumes approximately half the area will require hand-seeding to achieve revegetation <br />BMulching will be conducted using conventional hydro-seeder/hydro-mulcher <br />9NoTrees and shrubs will be planted since most slopes are south and west-facing <br />10Supervisor costs are figured at 25 percent of the total work hours to accomplish the reclamation effort <br />. MDE (3-12-08) <br />