Laserfiche WebLink
<br />SCOPE <br />Steffens and Associates, Inc. (SAlnc) has evaluated the changes in Storm Water <br />Management Plan that will be required to implemented for the proposed MLE project at the <br />Cresson Project <br />The scope of this section specifically relates to lands that will be affected by the <br />proposed MLE Project, and excludes the management of storm water runoff that reports to <br />either the Valley Leach Facility (Golder Associates and Smith Williams Consultants) or to the <br />existing mine area. Amendment No. 8 and previous expansions include storm water <br />management plans for these areas, such as ECME portion of the East Cresson mine in <br />Vindicator Valley and South Cresson portion of the Main Cresson mine that will not be <br />additionally affected by this expansion. The drainage plans for those areas that will not be <br />affected by this expansion are presented in "East Cresson Mine Extension Drainage Report <br />and Plan" (2004) by Golder Associates, Inc. and Amendment No. 8 to Mined Land <br />Reclamation Permit M1980-244, Volume IV, March 2000. <br />The drainage plan proposed in this report includes storm water management designs <br />for two distinct periods:: <br />• During operations as the mine areas are developed and/or extended, and <br />• Post reclamation and closure. <br />• <br />Client:CC8~V Gold Mining Co. 4/11/08 <br />Title: Storm Water Management, MLE Page 3 <br />