My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (328)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (328)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
5/12/2008 10:20:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VII APP 10 Storm Water Mgmt during Operations & for Final Reclamation and Closure
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />i• <br />5.00 <br />0.00 <br />0.1 0.45 0.67 1 <br />Shields Shear (Ib/sq.ft.) <br />• Figure 6 Riprap Size as Function of Slope and Shields Shear Stress <br />Client:CC&V Gold Mining Co. <br />Title: Storm Water Management, MLE <br />b. Shields Shear t = 62.4 x depth x channel slope (Ib/sf) <br />c. Dsa = 21 t <br />62.4 (SG-1) [cos a tan ~ - sin A] <br />where SG is Specific Gravity of Stones <br />~ is the slope of the channel in degrees <br />~ is the angle of repose in degrees = 42° <br />for angular rock of most riprap sizes. <br />d. For constant ~ of 42° the equations resolve to <br />DSO, = f(Slope, Shields Shear) (Figure 1) <br />Invert D50 as Function of Slope and Shields <br />Shear <br />30.00 <br />25.00 <br />rn <br />c <br />'c 20.00 <br />J <br />~ 15.00 <br />t <br />U <br />w <br />O <br />10.00 <br />10 <br />4/11 /08 <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.