Laserfiche WebLink
• <br />• <br />• <br /> Storm Water Management Area <br /> East Crosson & Wild Hotse <br /> R <br /> Basin Ch.EC1a Basin Ch.EC16 Basin <br />Ch. WH-A COSH 1a COSA1 ECOSA 1 <br /> <br />ti . <br />I» Ch.EC1c ~ ~: Basin <br /> <br />t"C <br />E <br />Ch. WH-C <br />~ `2 COSA2 <br /> Up Ch.EC2a <br />Ch. WH-B sin <br /> EMP--015 Spillway <br /> <br />EMP-010 <br />9AF <br />3 <br />Lv 2 20.3 AF =J <br />G <br />, Basin <br />COS <br />. <br />~Ch. WH-D <br />'P~ <br />' Basin Ch <br />EC2tr <br />~ <br />G'~ <br />,o~~ . <br />~ <br />~ish Ch.EC3a COSA3 <br />~ EMP-016 ~ ~ ~ ~ ~ _.~ <br />S.ZAI= Splllway~.ECB EMP-017 <br />11.5AF <br />Figure 3 -East Cresson and Wildhorse Storm Water Mangement a fter Closure <br />Figure 4 -Storm Water Management after Closure, West Side North of Squaw <br />Gulch <br />Client:CC8~V Gold Mining Co. <br />Title: Storm Water Management, MLE <br />4/11 /08 <br />Page 9 <br />Storm Water Marrayemenf Area <br />North Cresson and Poverty Gulch <br />