My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (328)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (328)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:12 PM
Creation date
5/12/2008 10:20:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
4/15/2008
Doc Name
VOL VII APP 10 Storm Water Mgmt during Operations & for Final Reclamation and Closure
From
CC & V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Hydrology Calculations for Design Storms (SEDCAD4) <br />Runoff estimates were calculated for three scenarios <br />• A two times a single 10-yr/24 hr Storm during Operations to determine the size of <br />ponds and the expected volume and flow rates during operations. <br />• A single 100-year/24 hr. Storm during operations to determine the design flow <br />capacity of channels and spillways <br />• A two times a single 10-yr/24 hr Storm after Reclamation to demonstrate the change <br />in flow and volume after closure. <br />Client:CC&V Gold Mining Co. <br />Title: Storm Water Management, MLE <br />4/11 /08 <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.