Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Perrnit Renewa105 <br />Task description : Regrade Haul Road to 11-West Refuse Pile <br /> <br />HOURLY~E;:.;;UIPMENT C;:.;;;; :. ............................................................................................................................ <br />Q OST~~ .............................................................. <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : <br />$71.49 NA <br />_ <br />Operating cost/hour : $103.27 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $207.53 Total fleet cost/hour : $622.60 <br /> <br />..................................................................................................................................... <br />MATERIAL:::::UANTITI..E .::::::..................................................................................................................................... <br />Q S <br />............................................................. <br />.............................................................. <br />Initial Swell Loose <br />volume : 3,000 CCY factor : 1.125 volume : 3,375 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 700.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.93 (Cat HB) <br />Average push gradient : 4.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,200 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.36 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 252.09 LCY/hr <br /> Adjusted fleet production : 756.28 LCY/hr <br /> <br /> <br />.............. <br />JOB~TIME AND~COST ::::::................ <br />..................... <br />..................... <br />.......................... <br />.......................... <br />............................................................................. <br />............................................................................. <br />.......................... <br />......................... <br />... . <br />................................. <br />Fleet size : 3 Dozers) Total job time : 4.46 Hours <br />Unit cost : $0.823 /LCY Total job cost : $2,778 <br /> <br />