Laserfiche WebLink
ROAD':: <::> : ........ ...... <br />....................................................sheet 2 of 2 <br />ABL.• <br />EE ~~~ <br />UIP~~ <br />Q MENT ~~~~ <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />-Flatbed Truck, 6x4, 45K GVW $82.02 10 $820.18 $820.18 <br />Subtotals :~ $820.18 ~ $820.18 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Delta <br />Transportation Cycle Time : Non- Total one-way travel distance : 45 <br />0 <br />il <br /> . <br />m <br />es <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.00 1.00 Total non-roadable mob/demob cost * : $13,828.91 <br />Return time (hours) = 1.00 1.00 • two round trips with haul rig <br />Loading time (hours) = 2.50 NA Total roadable mob/demob cost ** : $1,640.35 <br />Unloading time (hours) = 2.50 NA •• one round trip, no haul rig <br />Subtotals = 7.00 2.00 <br /> <br />JOB TIME:.AN..D :::::.:...................... <br />COST ........................... ................................. ............................................................................................. <br />Total job time : ........ ....................... <br />14.00 hours <br />::>:<>:::>::>::>::>::>::>:>:.;:.;;;;;;;;;;:.;:.;;;;;;;;;;:.;:.;:.;;;;;;;;: ;; :< :.;;;;;;:.; ::::..:.:. :::.::::::::::::.:::.::::::.: :::::::::::::::......................................... <br /> Total job cost : $15,469 <br />