Laserfiche WebLink
....................................................................................................................................sheet 2 of 2<. <br />ROADABLE ;E:<.;:UI PMENT;.;::.; :.:.................................................................................................................................................................... <br />...............................:... <br />Q <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 6x4, 45K GVW $99.31 1 $99.31 $99.31 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $99.31 $99.31 <br />..................................................................................................................................................................................... <br />E::. UIPMENT HAUL DISTANCE an::::TIME~ ::::::.......................................................................................................................................................... <br />............................ <br />Q d <br /> Nearest major city or town within project area region : Delta <br />Transportation Cvcle Time : Non- Total one-way travel distance : 45.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.29 1.29 Total non-roadable mob/demob cost " : $4,268.89 <br />Return time (hours) = 1.29 1.29 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost "" : $255.37 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 3.57 2.57 <br />JOB TIME AND COST Total job time : 7.14 hours <br />Total job cost : $4,524 <br />