My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-09_REVISION - C1981022 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2008-05-09_REVISION - C1981022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:26 PM
Creation date
5/9/2008 2:52:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/9/2008
Doc Name
Cost Estimate Memo ( 2 of 2)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
PR5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,650 pounds/LCY <br />Material description <br />Decomposed rock - 25% Rock, 75% Earth <br />Cvcle Time <br />Rated payload : 75,000 pounds <br />Payload capacity : 28.30 LCY <br />Scraper loading time * : 1.00 <br />Maneuver and spread time : 0.60 <br />`load time per scraper pair on push-pull models <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 28.30 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 6,200 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 NA (Cat HB) <br />minutes Job efficiency : 0.830 NA (Cat HB) <br /> Net correction : 0.830 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Hanl Rnuta <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,000 10.00 5.00 15.00 589 1.71 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 1.71 minutes <br />Return route <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />"travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.41 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.71 minutes <br />Unadjusted unit production/hour : 914.30 LCY/hour *** Adjusted for job conditions : 758.87 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 758.87 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 758.87 LCY/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 13.12 Hours <br />Unit cost : $0.825 /LCY Total job cost : $8,218 <br /> <br />