Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 05 <br />Task description :Remove East Bench Pond <br />HOURLY :.;:.;:.:.... .................................................................................................................................................................................. <br />........ <br />E UIPM <br />ENT~C <br />Q OST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br />Data source : (CRG) <br />volume : 400 CCY factor : 1.165 volume : 466 LCY <br /> <br />Source of estimated volume :Map 15 <br />Source of estimated swell factor :CAT Handbook <br /> <br /> <br /> <br /> <br />.............................. <br />HOURLY :P;;:::.: _.......__ ... <br />RODUCTI <br />ON <br /> <br /> <br />...............................................:::::::::::::::::::::::::::::::::::::::::::::::::::::::: <br />. ..................._ ...................._..........__........_._...... .............. <br />Job Condition Correction Factors <br /> <br /> <br />:::::::::::::::::::::::: <br />..._....._._........_ <br /> <br /> <br />:::: ;;;;;;;;;;:.;:.;:.;:.;:.;:.;:.;:.;;:.: <br />..._....._................ . <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiff/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-r fl <br /> Push gradient : 0.79 (Cat HB) <br />Average push gradient : 10.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.28 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 590.04 LCY/hr <br /> Adjusted fleet production : 590.04 LCY/hr <br /> <br />JOB TIME AND CO;;.T;;:.;:.;; ................................... <br />S ...................................... ................................................................... ........................ ................................. <br />Fleet size : 1 Dozers) Total job time : 0.79 Hours <br />Unit cost : $0.352 /LCY Total job cost : $164 <br /> <br />