My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-09_REVISION - C1981022 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2008-05-09_REVISION - C1981022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:26 PM
Creation date
5/9/2008 2:49:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/9/2008
Doc Name
Cost Estimate Memo ( 1 of 2)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
PR5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 050 <br />Date : 05/06/2008 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Site : Sanborn Creek Mine <br />PermiUjob # : C-81-022 <br />Abbreviation :none <br />Filename : C022-050 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 05 <br />Task description :Excavate for Elk Creek Riprap Placement <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 330C L Horsepower : 244 <br />Weight (MT) : 33.72 <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $45.61 NA Shift basis : 1 per day <br />Operating cosUhour : $61.06 100 Data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $139.63 Total fleet cost/hour : $139.63 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 32,915 BCY factor : 1.250 volume : 41,144 LCY <br />Source of estimated volume : Plate #1 <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket, swing loaded, dump bucket, swing empt <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br /> Cycle time value : 0.32 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.12 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 0.95 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,400 feet Altitude adjustment : 1.00 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production : 177.94 LCY/hour <br />Adjusted hourly unit production : 147.69 LCY/hour <br />Adjusted hourly fleet production : 147.69 LCY/hour <br /> <br />JOB TIME AND COST ................................ . <br />Fleet size : 1 excavator(s) Total job time : 278.58 hours <br />Unit cost : $0.945 per LCY <br />~~~ Total job cost : $38,898 <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.