Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 046 <br />Date : 05/06/2008 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Site :Sanborn Creek Mine <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 05 <br />Task description :Excavate for Lower Hubbard Creek Riprap Placement <br />HOURLY:.E::::UIPMENT C;;;T:::;::.; .................................................................................................................................................................... <br />.............................. <br />Q OS <br />Machine description :Cat 330C L <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $45.61 NA <br />Operating cost/hour : $61.06 100 <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $139.63 <br />1.12 LCY (heaped) Bucket size class <br />0.85 Hard, tough clay (80% - 90%) <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,512 BCY factor : 1.250 volume : 1,890 LCY <br />Source of estimated volume : TR-05; Appendix K <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket. swin4 ematy) <br />Basic job condition description <br />Secondary job condition within basic description <br />Cycle time value <br />Bucket Capacity <br />Rated bucket capacity <br />Bucket fill factor <br />Adjusted bucket capacity <br />Horsepower: 244 <br />Weight (MT) : 33.72 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cosUhour : $139.63 <br />AVERAGE <br />AVERAGE <br />0.32 minutes <br />small <br />0.95 LCY <br />Job Condition Correction Factors <br />Site altitude : 6,400 feet <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />Source <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />177.94 LCY/hour <br />147.69 LCYlhour <br />147.69 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 12.80 hours <br />Unit cost : $0.945 per LCY Total job cost : $1,787 <br />Permit/job # : C-81-022 <br />Abbreviation :none <br />Filename : C022-046 <br />