Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Regrade Light-Use Roads from Technical Revisions 54, 56 and 57 <br />HOURLY:E; ; ;.; ........................................................................................................................................................................... <br />UIPM ~~ <br />ENT C <br />Q OST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $622.60 <br />MATERIAL:::::UANTITI :::::::............... <br />Q ES .......................................................... ................................................................. .......................... .................................. <br />Initial Swell Loose <br />volume : 12,100 BCY factor : 1.250 volume : 15,125 LCY <br /> <br />• Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY..PR;.;D::;.C:::;:::..__ _ ............. <br />O U TION ..... ................ .........._._...... _........................ __.. <br /> <br />Job Condition Correction Factors ._ .................... ........... _...._. <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-r>) <br /> Push gradient : 0.85 (Cat HB) <br />Average push gradient : 7.50 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,700 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.29 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 259.96 LCY/hr <br /> Adjusted fleet production : 779.87 LCY/hr <br /> <br />JOB TIME AND C::::::T ::::::.................. <br />OS ......................................................... .................................................................. .......................... ................................ <br />Fleet size : 3 Dozers) Total job time : 19.39 Hours <br />Unit cost : $0.798 /LCY Total job cost : $12,075 <br /> <br />